Determination of the cost-benefit efficient interval for sponge city construction by a multi-objective optimization model

The cost-benefit is a key factor when selecting an appropriate sponge city construction scheme. The research of applying intelligent technology to find cost-benefit efficient planning and construction of sponge city is urgently required. This paper established a multi-objective simulation optimizati...

Full description

Bibliographic Details
Main Authors: Changmei Liang, Xiang Zhang, Jie Liu, Luguang Liu, Shiyong Tao
Format: Article
Language:English
Published: Frontiers Media S.A. 2023-01-01
Series:Frontiers in Environmental Science
Subjects:
Online Access:https://www.frontiersin.org/articles/10.3389/fenvs.2022.1072505/full
Description
Summary:The cost-benefit is a key factor when selecting an appropriate sponge city construction scheme. The research of applying intelligent technology to find cost-benefit efficient planning and construction of sponge city is urgently required. This paper established a multi-objective simulation optimization framework of sponge city construction which considered minimization of runoff control rate, pollutant control rate and life-cycle cost Non-dominated sorting genetic algorithm (NSGA-II) was successfully coupled to Storm water management model to complete the simulation-optimization process. A case study in Xining, China, was conducted to demonstrate the proposed framework. The results of this research suggested that 1) different sponge city construction schemes lead to different runoff control rates and pollutant control rates although under the same investment; 2) the runoff control rate and pollutant control rate total suspended solids decreased with the increase of the rainfall return period, while the cost of sponge city construction increased with the increase of rainfall return period. Furthermore, for T = 2-year, the sponge facility exhibited the most stable control effect on runoff and pollutants among the three different return periods (T = 2-year, 5-year, 10-year); 3) sponge city construction exhibited a “cost-benefit” efficient interval. For T = 2-year, the cost-benefit high efficiency interval of sponge city construction is calculated between 1.2 billion and 1.8 billion; for T = 5-year, the interval is between 1.2 billion and 1.8 billion, while for T = 10-year, the interval is between 1.3 billion and 2.1 billion. The above observations provide reference for reasonable and effective sponge city construction in Xining, China.
ISSN:2296-665X