Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective
The problem of randomness and fuzziness of mechanical design could effectively dealed with through the fuzzy reliability optimization design which established by the combination of fuzzy mathematics method and mechanical optimization technique.Taking the multi-stage planetary gear train as research...
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Mechanical Transmission
2015-01-01
|
Series: | Jixie chuandong |
Subjects: | |
Online Access: | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2015.01.017 |
_version_ | 1797819495572570112 |
---|---|
author | Hao Liping |
author_facet | Hao Liping |
author_sort | Hao Liping |
collection | DOAJ |
description | The problem of randomness and fuzziness of mechanical design could effectively dealed with through the fuzzy reliability optimization design which established by the combination of fuzzy mathematics method and mechanical optimization technique.Taking the multi-stage planetary gear train as research object,the optimization and allocation of transmission ratio is implemented by the conventional optimization design method.On this basis,taking the fuzzy reliability constraints as the main constraint condition,the volume,transmission efficiency and contact ratio as object,the multi-objective fuzzy reliability optimization mathematical model is established.Then the fuzzy reliability optimization design is transformed into conventional reliability optimization design through the multistage fuzzy comprehensive evaluation,and the optimization design is carried out by using Matlab optimization toolbox. |
first_indexed | 2024-03-13T09:24:47Z |
format | Article |
id | doaj.art-01aa8dcdd3674febad2791fd5991d0dc |
institution | Directory Open Access Journal |
issn | 1004-2539 |
language | zho |
last_indexed | 2024-03-13T09:24:47Z |
publishDate | 2015-01-01 |
publisher | Editorial Office of Journal of Mechanical Transmission |
record_format | Article |
series | Jixie chuandong |
spelling | doaj.art-01aa8dcdd3674febad2791fd5991d0dc2023-05-26T09:36:55ZzhoEditorial Office of Journal of Mechanical TransmissionJixie chuandong1004-25392015-01-0139879129914705Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objectiveHao LipingThe problem of randomness and fuzziness of mechanical design could effectively dealed with through the fuzzy reliability optimization design which established by the combination of fuzzy mathematics method and mechanical optimization technique.Taking the multi-stage planetary gear train as research object,the optimization and allocation of transmission ratio is implemented by the conventional optimization design method.On this basis,taking the fuzzy reliability constraints as the main constraint condition,the volume,transmission efficiency and contact ratio as object,the multi-objective fuzzy reliability optimization mathematical model is established.Then the fuzzy reliability optimization design is transformed into conventional reliability optimization design through the multistage fuzzy comprehensive evaluation,and the optimization design is carried out by using Matlab optimization toolbox.http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2015.01.017Planetary gear train;Multi-objective;Fuzzy-reliability;Optimization design |
spellingShingle | Hao Liping Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective Jixie chuandong Planetary gear train;Multi-objective;Fuzzy-reliability;Optimization design |
title | Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective |
title_full | Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective |
title_fullStr | Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective |
title_full_unstemmed | Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective |
title_short | Fuzzy Reliability Optimal Design of Multi-stage Planetary Gear Train with Multi-objective |
title_sort | fuzzy reliability optimal design of multi stage planetary gear train with multi objective |
topic | Planetary gear train;Multi-objective;Fuzzy-reliability;Optimization design |
url | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2015.01.017 |
work_keys_str_mv | AT haoliping fuzzyreliabilityoptimaldesignofmultistageplanetarygeartrainwithmultiobjective |