A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation
To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...
Auteurs principaux: | Pengfei Zhang, Runcai Bai, Xue Sun, Haoran Li, Honglu Fei, Shijie Bao |
---|---|
Format: | Article |
Langue: | English |
Publié: |
Wiley
2021-01-01
|
Collection: | Geofluids |
Accès en ligne: | http://dx.doi.org/10.1155/2021/3645438 |
Documents similaires
-
Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine
par: Zuoming Yin, et autres
Publié: (2021-01-01) -
Optimization of blasting parameters and prediction of vibration effects in open pit mines based on deep neural networks
par: Runcai Bai, et autres
Publié: (2023-05-01) -
SPECIFIC FEATURES OF ORE FORMATION OF BARUN-SHIVEINSKOE TUNGSTEN DEPOSIT (EASTERN TRANSBAIKALIA)
par: Bair N. Abramov
Publié: (2021-09-01) -
Characteristics and Energy Distribution of Blast-Induced Ground Vibration in Deep-Hole Blasting
par: Shijie Bao, et autres
Publié: (2023-03-01) -
Investigation of Rock Joint and Fracture Influence on Delayed Blasting Performance
par: Pengfei Zhang, et autres
Publié: (2023-09-01)