A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation
To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...
Главные авторы: | Pengfei Zhang, Runcai Bai, Xue Sun, Haoran Li, Honglu Fei, Shijie Bao |
---|---|
Формат: | Статья |
Язык: | English |
Опубликовано: |
Wiley
2021-01-01
|
Серии: | Geofluids |
Online-ссылка: | http://dx.doi.org/10.1155/2021/3645438 |
Схожие документы
-
Optimization and Application of Spacing Parameter for Loosening Blasting with 24-m-High Bench in Barun Open-Pit Mine
по: Zuoming Yin, и др.
Опубликовано: (2021-01-01) -
Optimization of blasting parameters and prediction of vibration effects in open pit mines based on deep neural networks
по: Runcai Bai, и др.
Опубликовано: (2023-05-01) -
SPECIFIC FEATURES OF ORE FORMATION OF BARUN-SHIVEINSKOE TUNGSTEN DEPOSIT (EASTERN TRANSBAIKALIA)
по: Bair N. Abramov
Опубликовано: (2021-09-01) -
Characteristics and Energy Distribution of Blast-Induced Ground Vibration in Deep-Hole Blasting
по: Shijie Bao, и др.
Опубликовано: (2023-03-01) -
Investigation of Rock Joint and Fracture Influence on Delayed Blasting Performance
по: Pengfei Zhang, и др.
Опубликовано: (2023-09-01)