A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation
To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...
প্রধান লেখক: | , , , , , |
---|---|
বিন্যাস: | প্রবন্ধ |
ভাষা: | English |
প্রকাশিত: |
Wiley
2021-01-01
|
মালা: | Geofluids |
অনলাইন ব্যবহার করুন: | http://dx.doi.org/10.1155/2021/3645438 |