A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation

To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...

Mô tả đầy đủ

Chi tiết về thư mục
Những tác giả chính: Pengfei Zhang, Runcai Bai, Xue Sun, Haoran Li, Honglu Fei, Shijie Bao
Định dạng: Bài viết
Ngôn ngữ:English
Được phát hành: Wiley 2021-01-01
Loạt:Geofluids
Truy cập trực tuyến:http://dx.doi.org/10.1155/2021/3645438