Dual Control Strategy for Grid-tied Battery Energy Storage Systems to Comply with Emerging Grid Codes and Fault Ride Through Requirements

Battery energy storage systems (BESSs) need to comply with grid code and fault ride through (FRT) requirements during disturbances whether they are in charging or discharging mode. Previous literature has shown that constant charging current control of BESSs in charging mode can prevent BESSs from c...

Full description

Bibliographic Details
Main Authors: Maxime Berger, Ilhan Kocar, Evangelos Farantatos, Aboutaleb Haddadi
Format: Article
Language:English
Published: IEEE 2022-01-01
Series:Journal of Modern Power Systems and Clean Energy
Subjects:
Online Access:https://ieeexplore.ieee.org/document/9594776/
Description
Summary:Battery energy storage systems (BESSs) need to comply with grid code and fault ride through (FRT) requirements during disturbances whether they are in charging or discharging mode. Previous literature has shown that constant charging current control of BESSs in charging mode can prevent BESSs from complying with emerging grid codes such as the German grid code under stringent unbalanced fault conditions. To address this challenge, this paper proposes a new FRT-activated dual control strategy that consists of switching from constant battery current control to constant DC-link voltage control through a positive droop structure. The results show that the strategy ensures proper DC-link voltage and current management as well as adequate control of the positive- and negative-sequence active and reactive currents according to the grid code priority. It is also shown that the proposed FRT control strategy is tolerant to initial operating conditions of BESS plant, grid code requirements, and fault severity.
ISSN:2196-5420