Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
The underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear....
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-07-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/13/8/1943 |
_version_ | 1797585286276841472 |
---|---|
author | Jianbing Lv Jianjun Lu Jingkai Huang Juan Huang Jia Li Xiangyang Ge |
author_facet | Jianbing Lv Jianjun Lu Jingkai Huang Juan Huang Jia Li Xiangyang Ge |
author_sort | Jianbing Lv |
collection | DOAJ |
description | The underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear. It is important to clarify the deformation law of the hole pile excavation method in weak strata and the effect achieved by appropriate reinforcement measures. In this paper, by establishing a three-dimensional finite element model of the structure–soil contact element and combining it with the field monitoring data, the law of surface settlement caused by the hole pile excavation method with different thicknesses of the weak stratum has been studied. In order to improve the stability of the surrounding rock and reduce the vertical deformation of the surface, the Metro Jet System (MJS) is used to form inclined piles in the area of large surface deformation, and the effect after reinforcement was evaluated. The results show that as the weak layer thickness ratio increases, the surface settlement also increases. In the case of no reinforcement, a vertical settlement of 116 mm can be achieved when the thickness of the weak layer is 14 m. The vault of the tunnel is in the weak layer and the deformation is obvious. When the vault is not in the weak layer, the settlement is obviously reduced. After MJS pile reinforcement, under the action of soil extrusion, the self-stability of the surrounding rock is strengthened, and the oblique jet grouted pile forms a stable ‘triangle’. The vertical settlement value is basically stable at around 30 mm, which meets the requirements of the regulations. If the tunnel is not reinforced, the self-stability of the surrounding rock above the tunnel arch is poor and the maximum settlement is at the surface. After MJS reinforcement, the maximum settlement is at the vault. The vertical settlement of the ground surface can be effectively controlled by using the MJS pile forming technology in the middle of the tunnel pile driving method. |
first_indexed | 2024-03-11T00:03:59Z |
format | Article |
id | doaj.art-024ea2df87634ddd89b1b64d04b0ab3f |
institution | Directory Open Access Journal |
issn | 2075-5309 |
language | English |
last_indexed | 2024-03-11T00:03:59Z |
publishDate | 2023-07-01 |
publisher | MDPI AG |
record_format | Article |
series | Buildings |
spelling | doaj.art-024ea2df87634ddd89b1b64d04b0ab3f2023-11-19T00:28:43ZengMDPI AGBuildings2075-53092023-07-01138194310.3390/buildings13081943Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak StratumJianbing Lv0Jianjun Lu1Jingkai Huang2Juan Huang3Jia Li4Xiangyang Ge5School of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaThe underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear. It is important to clarify the deformation law of the hole pile excavation method in weak strata and the effect achieved by appropriate reinforcement measures. In this paper, by establishing a three-dimensional finite element model of the structure–soil contact element and combining it with the field monitoring data, the law of surface settlement caused by the hole pile excavation method with different thicknesses of the weak stratum has been studied. In order to improve the stability of the surrounding rock and reduce the vertical deformation of the surface, the Metro Jet System (MJS) is used to form inclined piles in the area of large surface deformation, and the effect after reinforcement was evaluated. The results show that as the weak layer thickness ratio increases, the surface settlement also increases. In the case of no reinforcement, a vertical settlement of 116 mm can be achieved when the thickness of the weak layer is 14 m. The vault of the tunnel is in the weak layer and the deformation is obvious. When the vault is not in the weak layer, the settlement is obviously reduced. After MJS pile reinforcement, under the action of soil extrusion, the self-stability of the surrounding rock is strengthened, and the oblique jet grouted pile forms a stable ‘triangle’. The vertical settlement value is basically stable at around 30 mm, which meets the requirements of the regulations. If the tunnel is not reinforced, the self-stability of the surrounding rock above the tunnel arch is poor and the maximum settlement is at the surface. After MJS reinforcement, the maximum settlement is at the vault. The vertical settlement of the ground surface can be effectively controlled by using the MJS pile forming technology in the middle of the tunnel pile driving method.https://www.mdpi.com/2075-5309/13/8/1943tunnelingpile excavation methodweak stratumMJS methodstructure–soil interaction |
spellingShingle | Jianbing Lv Jianjun Lu Jingkai Huang Juan Huang Jia Li Xiangyang Ge Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum Buildings tunneling pile excavation method weak stratum MJS method structure–soil interaction |
title | Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum |
title_full | Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum |
title_fullStr | Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum |
title_full_unstemmed | Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum |
title_short | Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum |
title_sort | deformation analysis and reinforcement effect of tunnel pile excavation of a subway station in a weak stratum |
topic | tunneling pile excavation method weak stratum MJS method structure–soil interaction |
url | https://www.mdpi.com/2075-5309/13/8/1943 |
work_keys_str_mv | AT jianbinglv deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum AT jianjunlu deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum AT jingkaihuang deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum AT juanhuang deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum AT jiali deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum AT xiangyangge deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum |