Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum

The underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear....

Full description

Bibliographic Details
Main Authors: Jianbing Lv, Jianjun Lu, Jingkai Huang, Juan Huang, Jia Li, Xiangyang Ge
Format: Article
Language:English
Published: MDPI AG 2023-07-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/13/8/1943
_version_ 1797585286276841472
author Jianbing Lv
Jianjun Lu
Jingkai Huang
Juan Huang
Jia Li
Xiangyang Ge
author_facet Jianbing Lv
Jianjun Lu
Jingkai Huang
Juan Huang
Jia Li
Xiangyang Ge
author_sort Jianbing Lv
collection DOAJ
description The underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear. It is important to clarify the deformation law of the hole pile excavation method in weak strata and the effect achieved by appropriate reinforcement measures. In this paper, by establishing a three-dimensional finite element model of the structure–soil contact element and combining it with the field monitoring data, the law of surface settlement caused by the hole pile excavation method with different thicknesses of the weak stratum has been studied. In order to improve the stability of the surrounding rock and reduce the vertical deformation of the surface, the Metro Jet System (MJS) is used to form inclined piles in the area of large surface deformation, and the effect after reinforcement was evaluated. The results show that as the weak layer thickness ratio increases, the surface settlement also increases. In the case of no reinforcement, a vertical settlement of 116 mm can be achieved when the thickness of the weak layer is 14 m. The vault of the tunnel is in the weak layer and the deformation is obvious. When the vault is not in the weak layer, the settlement is obviously reduced. After MJS pile reinforcement, under the action of soil extrusion, the self-stability of the surrounding rock is strengthened, and the oblique jet grouted pile forms a stable ‘triangle’. The vertical settlement value is basically stable at around 30 mm, which meets the requirements of the regulations. If the tunnel is not reinforced, the self-stability of the surrounding rock above the tunnel arch is poor and the maximum settlement is at the surface. After MJS reinforcement, the maximum settlement is at the vault. The vertical settlement of the ground surface can be effectively controlled by using the MJS pile forming technology in the middle of the tunnel pile driving method.
first_indexed 2024-03-11T00:03:59Z
format Article
id doaj.art-024ea2df87634ddd89b1b64d04b0ab3f
institution Directory Open Access Journal
issn 2075-5309
language English
last_indexed 2024-03-11T00:03:59Z
publishDate 2023-07-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj.art-024ea2df87634ddd89b1b64d04b0ab3f2023-11-19T00:28:43ZengMDPI AGBuildings2075-53092023-07-01138194310.3390/buildings13081943Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak StratumJianbing Lv0Jianjun Lu1Jingkai Huang2Juan Huang3Jia Li4Xiangyang Ge5School of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaSchool of Civil and Transportation Engineering, Guangdong University of Technology, Guangzhou 510006, ChinaThe underground hole pile excavation method causes a large vertical displacement in a weak stratum, which affects the safety of structures. For the first time, the hole pile excavation method is being used to construct a subway station in South China, and the settlement law of the area is not clear. It is important to clarify the deformation law of the hole pile excavation method in weak strata and the effect achieved by appropriate reinforcement measures. In this paper, by establishing a three-dimensional finite element model of the structure–soil contact element and combining it with the field monitoring data, the law of surface settlement caused by the hole pile excavation method with different thicknesses of the weak stratum has been studied. In order to improve the stability of the surrounding rock and reduce the vertical deformation of the surface, the Metro Jet System (MJS) is used to form inclined piles in the area of large surface deformation, and the effect after reinforcement was evaluated. The results show that as the weak layer thickness ratio increases, the surface settlement also increases. In the case of no reinforcement, a vertical settlement of 116 mm can be achieved when the thickness of the weak layer is 14 m. The vault of the tunnel is in the weak layer and the deformation is obvious. When the vault is not in the weak layer, the settlement is obviously reduced. After MJS pile reinforcement, under the action of soil extrusion, the self-stability of the surrounding rock is strengthened, and the oblique jet grouted pile forms a stable ‘triangle’. The vertical settlement value is basically stable at around 30 mm, which meets the requirements of the regulations. If the tunnel is not reinforced, the self-stability of the surrounding rock above the tunnel arch is poor and the maximum settlement is at the surface. After MJS reinforcement, the maximum settlement is at the vault. The vertical settlement of the ground surface can be effectively controlled by using the MJS pile forming technology in the middle of the tunnel pile driving method.https://www.mdpi.com/2075-5309/13/8/1943tunnelingpile excavation methodweak stratumMJS methodstructure–soil interaction
spellingShingle Jianbing Lv
Jianjun Lu
Jingkai Huang
Juan Huang
Jia Li
Xiangyang Ge
Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
Buildings
tunneling
pile excavation method
weak stratum
MJS method
structure–soil interaction
title Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
title_full Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
title_fullStr Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
title_full_unstemmed Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
title_short Deformation Analysis and Reinforcement Effect of Tunnel Pile Excavation of a Subway Station in a Weak Stratum
title_sort deformation analysis and reinforcement effect of tunnel pile excavation of a subway station in a weak stratum
topic tunneling
pile excavation method
weak stratum
MJS method
structure–soil interaction
url https://www.mdpi.com/2075-5309/13/8/1943
work_keys_str_mv AT jianbinglv deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum
AT jianjunlu deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum
AT jingkaihuang deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum
AT juanhuang deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum
AT jiali deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum
AT xiangyangge deformationanalysisandreinforcementeffectoftunnelpileexcavationofasubwaystationinaweakstratum