“Four Zones” control model and application for surface subsidence of bed separation grouting mining

The grouting technology of bed separations has been proved to be a new method which can meet the requirements of non-destructive mining and solid waste reduction. To effectively control the subsidence of ground structures caused by mining, the whole process of bed separation grouting mining is analy...

Full description

Bibliographic Details
Main Authors: Lei HAN, Ke YANG, Tianjun WANG, Xiang YU, Chunmin PEI, Qi XU, Xiang HE
Format: Article
Language:zho
Published: Editorial Department of Coal Science and Technology 2023-08-01
Series:Meitan kexue jishu
Subjects:
Online Access:http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2023-0561
_version_ 1797448776517943296
author Lei HAN
Ke YANG
Tianjun WANG
Xiang YU
Chunmin PEI
Qi XU
Xiang HE
author_facet Lei HAN
Ke YANG
Tianjun WANG
Xiang YU
Chunmin PEI
Qi XU
Xiang HE
author_sort Lei HAN
collection DOAJ
description The grouting technology of bed separations has been proved to be a new method which can meet the requirements of non-destructive mining and solid waste reduction. To effectively control the subsidence of ground structures caused by mining, the whole process of bed separation grouting mining is analyzed in a steady state based on the key stratum theory. For the first time, a “four zones” control model for surface subsidence under grouting bed separation was proposed, which includes natural zone, transition zone, warning zone, and protection zone, and the calculation formula for the “four zones” range was derived. Based on the engineering back-ground of controlling the subsidence of the ground coking plant at the 3501 panel, the proposed “four zones” model was validated by combining physical modelling and field measurement of subsidence. The results show that the surface subsidence curve of bed separation grouting in physical modelling shows an irregular “V” shape, and the surface subsidence of the panel first increases rapidly. After reaching the maximum subsidence, the surface subsidence first decreases rapidly, and then the reduction rate gradually slows down. The subsidence curve shows a clear “four zones” distribution, with a maximum subsidence of 1589 mm, appearing at the contact boundary between the natural zone and the transition zone. The subsidence of the contact boundary between the transition zone and the warning zone is 497.94 mm, and there is basically no subsidence within the protection zone. The predicted surface subsidence, horizontal deformation, slope, and curvature caused by mining under grouting conditions based on probability integral method are consistent with the field measured results, but significantly smaller than the predicted values under non-grouting conditions. It is determined that the surface deformation under grouting conditions meets the requirements of Grade I damage level for structures. Based on the practical engineering geology and observed data of the mine, the natural area is 261.19 m, the transition area is 246.09 m, the warning area is 655.25 m, and the protection area is 199.53 m. The proposed “four zones” control model provides a fundamental theoretical basis for studying the subsidence of bed separation grouting mining.
first_indexed 2024-03-09T14:15:23Z
format Article
id doaj.art-02a3b5f48f804649a9d3be1f2a780a90
institution Directory Open Access Journal
issn 0253-2336
language zho
last_indexed 2024-03-09T14:15:23Z
publishDate 2023-08-01
publisher Editorial Department of Coal Science and Technology
record_format Article
series Meitan kexue jishu
spelling doaj.art-02a3b5f48f804649a9d3be1f2a780a902023-11-29T01:41:01ZzhoEditorial Department of Coal Science and TechnologyMeitan kexue jishu0253-23362023-08-01518233510.13199/j.cnki.cst.2023-05612023-0561“Four Zones” control model and application for surface subsidence of bed separation grouting miningLei HAN0Ke YANG1Tianjun WANG2Xiang YU3Chunmin PEI4Qi XU5Xiang HE6Shanxi Coal International Energy Group Co., Ltd., Taiyuan 030000, ChinaState Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan 232001, ChinaShanxi Coal International Energy Group Co., Ltd., Taiyuan 030000, ChinaState Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan 232001, ChinaShanxi Coal International Energy Group Co., Ltd., Taiyuan 030000, ChinaShanxi Coal International Energy Group Co., Ltd., Taiyuan 030000, ChinaState Key Laboratory of Mining Response and Disaster Prevention and Control in Deep Coal Mines, Anhui University of Science and Technology, Huainan 232001, ChinaThe grouting technology of bed separations has been proved to be a new method which can meet the requirements of non-destructive mining and solid waste reduction. To effectively control the subsidence of ground structures caused by mining, the whole process of bed separation grouting mining is analyzed in a steady state based on the key stratum theory. For the first time, a “four zones” control model for surface subsidence under grouting bed separation was proposed, which includes natural zone, transition zone, warning zone, and protection zone, and the calculation formula for the “four zones” range was derived. Based on the engineering back-ground of controlling the subsidence of the ground coking plant at the 3501 panel, the proposed “four zones” model was validated by combining physical modelling and field measurement of subsidence. The results show that the surface subsidence curve of bed separation grouting in physical modelling shows an irregular “V” shape, and the surface subsidence of the panel first increases rapidly. After reaching the maximum subsidence, the surface subsidence first decreases rapidly, and then the reduction rate gradually slows down. The subsidence curve shows a clear “four zones” distribution, with a maximum subsidence of 1589 mm, appearing at the contact boundary between the natural zone and the transition zone. The subsidence of the contact boundary between the transition zone and the warning zone is 497.94 mm, and there is basically no subsidence within the protection zone. The predicted surface subsidence, horizontal deformation, slope, and curvature caused by mining under grouting conditions based on probability integral method are consistent with the field measured results, but significantly smaller than the predicted values under non-grouting conditions. It is determined that the surface deformation under grouting conditions meets the requirements of Grade I damage level for structures. Based on the practical engineering geology and observed data of the mine, the natural area is 261.19 m, the transition area is 246.09 m, the warning area is 655.25 m, and the protection area is 199.53 m. The proposed “four zones” control model provides a fundamental theoretical basis for studying the subsidence of bed separation grouting mining.http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2023-0561bed separation grouting“four zones” control modelkey stratumsurface subsidencedamage gradeprobability integral method
spellingShingle Lei HAN
Ke YANG
Tianjun WANG
Xiang YU
Chunmin PEI
Qi XU
Xiang HE
“Four Zones” control model and application for surface subsidence of bed separation grouting mining
Meitan kexue jishu
bed separation grouting
“four zones” control model
key stratum
surface subsidence
damage grade
probability integral method
title “Four Zones” control model and application for surface subsidence of bed separation grouting mining
title_full “Four Zones” control model and application for surface subsidence of bed separation grouting mining
title_fullStr “Four Zones” control model and application for surface subsidence of bed separation grouting mining
title_full_unstemmed “Four Zones” control model and application for surface subsidence of bed separation grouting mining
title_short “Four Zones” control model and application for surface subsidence of bed separation grouting mining
title_sort four zones control model and application for surface subsidence of bed separation grouting mining
topic bed separation grouting
“four zones” control model
key stratum
surface subsidence
damage grade
probability integral method
url http://www.mtkxjs.com.cn/article/doi/10.13199/j.cnki.cst.2023-0561
work_keys_str_mv AT leihan fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT keyang fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT tianjunwang fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT xiangyu fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT chunminpei fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT qixu fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining
AT xianghe fourzonescontrolmodelandapplicationforsurfacesubsidenceofbedseparationgroutingmining