SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS

Effectively managing the delivery of Ready Mixed Concrete (RMC) for diverse construction projects poses a significant challenge for concrete batch plant supervisors. The formulation of an efficient schedule for dispatching concrete truck mixers is paramount, requiring a delicate balance between pra...

Full description

Bibliographic Details
Main Authors: Yasser M. Aboelmagd, Wael F. M. Mobarak, Remon Fayek Aziz Eskander
Format: Article
Language:English
Published: Regional Association for Security and crisis management, Belgrade, Serbia 2024-03-01
Series:Operational Research in Engineering Sciences: Theory and Applications
Subjects:
Online Access:https://oresta.org/menu-script/index.php/oresta/article/view/661
_version_ 1797193552684384256
author Yasser M. Aboelmagd
Wael F. M. Mobarak
Remon Fayek Aziz Eskander
author_facet Yasser M. Aboelmagd
Wael F. M. Mobarak
Remon Fayek Aziz Eskander
author_sort Yasser M. Aboelmagd
collection DOAJ
description Effectively managing the delivery of Ready Mixed Concrete (RMC) for diverse construction projects poses a significant challenge for concrete batch plant supervisors. The formulation of an efficient schedule for dispatching concrete truck mixers is paramount, requiring a delicate balance between practicality and adaptability. The concrete batch plant administrator must establish a productive timetable that aligns activities at the concrete batch facility and construction sites. RMC delivery requests inundate the ready mixed concrete batch plant during specific operational hours, necessitating swift decision-making by the concrete batch plant administrator to create a dispatching schedule that meets the varied requirements of different construction projects. The dispatching schedule time for all batch plants is primarily influenced by the dispatcher administrator's experience and preferences. For instance, a ready mixed concrete batch plant administrator may opt to dispatch as many truck mixers as possible to the busiest construction project. However, while the batch plant waits for the RMC trucks to arrive, this strategy may cause truck congestion at the project site. Clearly, an effective dispatching schedule is crucial for enhancing the overall system efficiency of construction projects and batch plants. This paper initially presents various optimization methods and subsequently analyses the ready mixed concrete system and its transportation strategy, delineating the factors impacting the dispatching schedule. The study then introduces a systematic model employing simulation processes and Genetic Algorithms to optimize the dispatching schedule while minimizing the waiting time of RMC truck mixers at construction projects. The goal of this optimisation is to meet the needs for RMC delivery from various building projects while minimising the impact on casting processes. Ultimately, concrete batch plant administrators will find assistance in organising and managing the dispatching procedure from an automated software that was created utilising the C-sharp programming language and included all pertinent modules. Three cases from the available research were examined, and field data from the DECOM batching facility was applied over the course of three working days to evaluate the software's effectiveness.
first_indexed 2024-03-07T14:12:16Z
format Article
id doaj.art-02fe6a9ffbb8436e8b4c50e10301b6b0
institution Directory Open Access Journal
issn 2620-1607
2620-1747
language English
last_indexed 2024-04-24T05:42:12Z
publishDate 2024-03-01
publisher Regional Association for Security and crisis management, Belgrade, Serbia
record_format Article
series Operational Research in Engineering Sciences: Theory and Applications
spelling doaj.art-02fe6a9ffbb8436e8b4c50e10301b6b02024-04-23T19:49:25ZengRegional Association for Security and crisis management, Belgrade, SerbiaOperational Research in Engineering Sciences: Theory and Applications2620-16072620-17472024-03-0164SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMSYasser M. Aboelmagd0Wael F. M. Mobarak1Remon Fayek Aziz Eskander2Civil Engineering Department, College of Engineering, University of Business & Technology (UBT), Jeddah, Saudi Arabia; Mathematics and Physics Engineering Department, Faculty of Engineering, Alexandria University, Egypt.Civil Engineering Department, College of Engineering, University of Business & Technology (UBT), Jeddah, Saudi Arabia; Mathematics and Physics Engineering Department, Faculty of Engineering, Alexandria University, Egypt.Engineering Programs Director, Field of Engineering, Alamein International University (AIU), New Al-Alamein City, Matrouh Egypt; Structural Engineering Department, Faculty of Engineering, Alexandria University, Egypt. Effectively managing the delivery of Ready Mixed Concrete (RMC) for diverse construction projects poses a significant challenge for concrete batch plant supervisors. The formulation of an efficient schedule for dispatching concrete truck mixers is paramount, requiring a delicate balance between practicality and adaptability. The concrete batch plant administrator must establish a productive timetable that aligns activities at the concrete batch facility and construction sites. RMC delivery requests inundate the ready mixed concrete batch plant during specific operational hours, necessitating swift decision-making by the concrete batch plant administrator to create a dispatching schedule that meets the varied requirements of different construction projects. The dispatching schedule time for all batch plants is primarily influenced by the dispatcher administrator's experience and preferences. For instance, a ready mixed concrete batch plant administrator may opt to dispatch as many truck mixers as possible to the busiest construction project. However, while the batch plant waits for the RMC trucks to arrive, this strategy may cause truck congestion at the project site. Clearly, an effective dispatching schedule is crucial for enhancing the overall system efficiency of construction projects and batch plants. This paper initially presents various optimization methods and subsequently analyses the ready mixed concrete system and its transportation strategy, delineating the factors impacting the dispatching schedule. The study then introduces a systematic model employing simulation processes and Genetic Algorithms to optimize the dispatching schedule while minimizing the waiting time of RMC truck mixers at construction projects. The goal of this optimisation is to meet the needs for RMC delivery from various building projects while minimising the impact on casting processes. Ultimately, concrete batch plant administrators will find assistance in organising and managing the dispatching procedure from an automated software that was created utilising the C-sharp programming language and included all pertinent modules. Three cases from the available research were examined, and field data from the DECOM batching facility was applied over the course of three working days to evaluate the software's effectiveness. https://oresta.org/menu-script/index.php/oresta/article/view/661Genetic AlgorithmsOptimizationC-Sharp languageScheduleRMCBatch Plant
spellingShingle Yasser M. Aboelmagd
Wael F. M. Mobarak
Remon Fayek Aziz Eskander
SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
Operational Research in Engineering Sciences: Theory and Applications
Genetic Algorithms
Optimization
C-Sharp language
Schedule
RMC
Batch Plant
title SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
title_full SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
title_fullStr SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
title_full_unstemmed SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
title_short SMART OPTIMIZER SCHEDULING MODEL FOR READY MIXED CONCRETE BATCH PLANTS AND TRUCKS FLEET BY USING GENETIC ALGORITHMS
title_sort smart optimizer scheduling model for ready mixed concrete batch plants and trucks fleet by using genetic algorithms
topic Genetic Algorithms
Optimization
C-Sharp language
Schedule
RMC
Batch Plant
url https://oresta.org/menu-script/index.php/oresta/article/view/661
work_keys_str_mv AT yassermaboelmagd smartoptimizerschedulingmodelforreadymixedconcretebatchplantsandtrucksfleetbyusinggeneticalgorithms
AT waelfmmobarak smartoptimizerschedulingmodelforreadymixedconcretebatchplantsandtrucksfleetbyusinggeneticalgorithms
AT remonfayekazizeskander smartoptimizerschedulingmodelforreadymixedconcretebatchplantsandtrucksfleetbyusinggeneticalgorithms