Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)

Sedimentation is such a crucial issue to be noted once the accumulated sediment begins to fill the reservoir dead storage, this will then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir m...

Full description

Bibliographic Details
Main Authors: Sri Legowo, Iwan K. Hadihardaja, Azmeri
Format: Article
Language:English
Published: ITB Journal Publisher 2009-11-01
Series:ITB Journal of Engineering Science
Subjects:
Online Access:http://journal.itb.ac.id/download.php?file=B09056.pdf&id=397&up=15
_version_ 1818894212072996864
author Sri Legowo
Iwan K. Hadihardaja
Azmeri
author_facet Sri Legowo
Iwan K. Hadihardaja
Azmeri
author_sort Sri Legowo
collection DOAJ
description Sedimentation is such a crucial issue to be noted once the accumulated sediment begins to fill the reservoir dead storage, this will then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management of activities. The continuous inflow of sediment to the reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful age of reservoir. Because of that, the rate of the sediment needs to be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This effort can be performed through; the regulation of fluctuating rate of reservoir surface current that does not cause suddenly drawdown and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP).The rate of bank erosion for the reservoir variates from 0.0009 to 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean while the rate of watershed sediment has a significant value, i.e: 3,02 MCM/year for Saguling that causes to fullfill the storage capacity in 40 next years (from years 2008).
first_indexed 2024-12-19T18:24:54Z
format Article
id doaj.art-033ce4010a7346ab8f987c569b1cc396
institution Directory Open Access Journal
issn 1978-3051
language English
last_indexed 2024-12-19T18:24:54Z
publishDate 2009-11-01
publisher ITB Journal Publisher
record_format Article
series ITB Journal of Engineering Science
spelling doaj.art-033ce4010a7346ab8f987c569b1cc3962022-12-21T20:10:52ZengITB Journal PublisherITB Journal of Engineering Science1978-30512009-11-01412148166Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)Sri LegowoIwan K. HadihardajaAzmeriSedimentation is such a crucial issue to be noted once the accumulated sediment begins to fill the reservoir dead storage, this will then influence the long-term reservoir operation. The sediment accumulated requires a serious attention for it may influence the storage capacity and other reservoir management of activities. The continuous inflow of sediment to the reservoir will decrease the capacity of reservoir storage, the reservoir value in use, and the useful age of reservoir. Because of that, the rate of the sediment needs to be delayed as possible. In this research, the delay of the sediment rate is considered based on the rate of flow of landslide of the reservoir slope. The rate of flow of the sliding slope can be minimized by way of each reservoir autonomous efforts. This effort can be performed through; the regulation of fluctuating rate of reservoir surface current that does not cause suddenly drawdown and upraising as well. The research model is compiled using the searching technique of Non Linear Programming (NLP).The rate of bank erosion for the reservoir variates from 0.0009 to 0.0048 MCM/year, which is no sigrificant value to threaten the life time of reservoir.Mean while the rate of watershed sediment has a significant value, i.e: 3,02 MCM/year for Saguling that causes to fullfill the storage capacity in 40 next years (from years 2008).http://journal.itb.ac.id/download.php?file=B09056.pdf&id=397&up=15rate of the sedimentlong-term reservoir operationcapacity of reservoir storagenon linear programmingsuddenlydrawdownupraising
spellingShingle Sri Legowo
Iwan K. Hadihardaja
Azmeri
Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
ITB Journal of Engineering Science
rate of the sediment
long-term reservoir operation
capacity of reservoir storage
non linear programming
suddenly
drawdown
upraising
title Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
title_full Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
title_fullStr Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
title_full_unstemmed Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
title_short Estimation of Bank Erosion Due To Reservoir Operation in Cascade (Case Study: Citarum Cascade Reservoir)
title_sort estimation of bank erosion due to reservoir operation in cascade case study citarum cascade reservoir
topic rate of the sediment
long-term reservoir operation
capacity of reservoir storage
non linear programming
suddenly
drawdown
upraising
url http://journal.itb.ac.id/download.php?file=B09056.pdf&id=397&up=15
work_keys_str_mv AT srilegowo estimationofbankerosionduetoreservoiroperationincascadecasestudycitarumcascadereservoir
AT iwankhadihardaja estimationofbankerosionduetoreservoiroperationincascadecasestudycitarumcascadereservoir
AT azmeri estimationofbankerosionduetoreservoiroperationincascadecasestudycitarumcascadereservoir