Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission
With the advancement of technology, the concept of logistics underwent extensive changes. Traditional logistics, no longer met the needs of customers, so it moved towards the integration of functions and processes. As the Navy's area of responsibility expanded, the duration of the naval mission...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
AJA Command and Staff University
2023-02-01
|
Series: | علوم و فنون نظامی |
Subjects: | |
Online Access: | https://www.qjmst.ir/article_704137_e51b0c189399a5a4e79be0ab670f50ef.pdf |
_version_ | 1827894647858397184 |
---|---|
author | Reza Roshani Alireza Bayati Mohhamad Hadi Hashemzade |
author_facet | Reza Roshani Alireza Bayati Mohhamad Hadi Hashemzade |
author_sort | Reza Roshani |
collection | DOAJ |
description | With the advancement of technology, the concept of logistics underwent extensive changes. Traditional logistics, no longer met the needs of customers, so it moved towards the integration of functions and processes. As the Navy's area of responsibility expanded, the duration of the naval mission also increased, but there was no change in the way floating units were supported. One of the major problems of traditional logistics is the time it takes to prepare floating units for deployment abroad. . The present study, which has been compiled in a descriptive method and with a mixed approach, has been conducted in order to explain the requirements for the implementation of an integrated procurement system in navy overseas missions. The statistical population includes 145 all logistics experts who have served in the floating unit and have at least a bachelor's degree and 20 years of service. . Interviews, questionnaires and library studies were used as data collection tools. . The results showed that in order to integrate the procurement of floating units, must be removed and principles of integrated logistics must be observed in all its components, which are: Reforming the organizational structure of logistics from a task to process orientation, elimination of duplicate components and activities, convergence of goals by strategic management levels, effective interaction between all components, comprehensive database, understanding the limitations of other components, perfect coordination between the flow of information and materials along the logistics chain, all information available in different parts of the organization have a specific format. |
first_indexed | 2024-03-12T22:10:36Z |
format | Article |
id | doaj.art-04902d3da2df447c9dfe2cb0a2da7571 |
institution | Directory Open Access Journal |
issn | 2008-191X 2676-4520 |
language | English |
last_indexed | 2024-03-12T22:10:36Z |
publishDate | 2023-02-01 |
publisher | AJA Command and Staff University |
record_format | Article |
series | علوم و فنون نظامی |
spelling | doaj.art-04902d3da2df447c9dfe2cb0a2da75712023-07-23T11:56:57ZengAJA Command and Staff Universityعلوم و فنون نظامی2008-191X2676-45202023-02-01186224328310.22034/qjmst.2023.527909.1521704137Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas MissionReza Roshani0Alireza Bayati1Mohhamad Hadi Hashemzade2Assistant Prof. and Faculty Member of AJA Command and Staff University, Tehran, Iran.Faculty Member of Command and Staff University. Tehran. Iran.MSc. in Defensive Management, AJA Command and Staff University, Tehran, Iran.With the advancement of technology, the concept of logistics underwent extensive changes. Traditional logistics, no longer met the needs of customers, so it moved towards the integration of functions and processes. As the Navy's area of responsibility expanded, the duration of the naval mission also increased, but there was no change in the way floating units were supported. One of the major problems of traditional logistics is the time it takes to prepare floating units for deployment abroad. . The present study, which has been compiled in a descriptive method and with a mixed approach, has been conducted in order to explain the requirements for the implementation of an integrated procurement system in navy overseas missions. The statistical population includes 145 all logistics experts who have served in the floating unit and have at least a bachelor's degree and 20 years of service. . Interviews, questionnaires and library studies were used as data collection tools. . The results showed that in order to integrate the procurement of floating units, must be removed and principles of integrated logistics must be observed in all its components, which are: Reforming the organizational structure of logistics from a task to process orientation, elimination of duplicate components and activities, convergence of goals by strategic management levels, effective interaction between all components, comprehensive database, understanding the limitations of other components, perfect coordination between the flow of information and materials along the logistics chain, all information available in different parts of the organization have a specific format.https://www.qjmst.ir/article_704137_e51b0c189399a5a4e79be0ab670f50ef.pdfintegrated procurementlogisticsfloating unitoverseas mission |
spellingShingle | Reza Roshani Alireza Bayati Mohhamad Hadi Hashemzade Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission علوم و فنون نظامی integrated procurement logistics floating unit overseas mission |
title | Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission |
title_full | Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission |
title_fullStr | Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission |
title_full_unstemmed | Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission |
title_short | Requirements for Implementing Integrated Procurement of Floating Units for Nedaja Overseas Mission |
title_sort | requirements for implementing integrated procurement of floating units for nedaja overseas mission |
topic | integrated procurement logistics floating unit overseas mission |
url | https://www.qjmst.ir/article_704137_e51b0c189399a5a4e79be0ab670f50ef.pdf |
work_keys_str_mv | AT rezaroshani requirementsforimplementingintegratedprocurementoffloatingunitsfornedajaoverseasmission AT alirezabayati requirementsforimplementingintegratedprocurementoffloatingunitsfornedajaoverseasmission AT mohhamadhadihashemzade requirementsforimplementingintegratedprocurementoffloatingunitsfornedajaoverseasmission |