Determination of Permissible Short-Time Emergency Overloading of Turbo-Generators and Synchronous Compensators

The paper shows that failure to take into account variable ratio of short-time emergency overloading of turbo-generators (synchronous compensators) that can lead to underestimation of overloading capacity or impermissible insulation over-heating.A method has been developed for determination of permi...

Full description

Bibliographic Details
Main Authors: V. A. Anischenko, V. A. Adamtsevich
Format: Article
Language:Russian
Published: Belarusian National Technical University 2011-08-01
Series:Izvestiâ Vysših Učebnyh Zavedenij i Ènergetičeskih ob Edinennij SNG. Ènergetika
Online Access:https://energy.bntu.by/jour/article/view/269
Description
Summary:The paper shows that failure to take into account variable ratio of short-time emergency overloading of turbo-generators (synchronous compensators) that can lead to underestimation of overloading capacity or impermissible insulation over-heating.A method has been developed for determination of permissible duration of short-time emergency over-loading that takes into account changes of over-loading ratio in case of a failure.
ISSN:1029-7448
2414-0341