Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines

This paper presents the analysis of power supply restoration time after failures occurring in power lines. It found that the power supply restoration time depends on several constituents, such as the time for obtaining information on failures, the time for information recognition, the time to repair...

Full description

Bibliographic Details
Main Authors: Alexander Vinogradov, Vadim Bolshev, Alina Vinogradova, Michał Jasiński, Tomasz Sikorski, Zbigniew Leonowicz, Radomir Goňo, Elżbieta Jasińska
Format: Article
Language:English
Published: MDPI AG 2020-05-01
Series:Energies
Subjects:
Online Access:https://www.mdpi.com/1996-1073/13/11/2736
_version_ 1797566639981461504
author Alexander Vinogradov
Vadim Bolshev
Alina Vinogradova
Michał Jasiński
Tomasz Sikorski
Zbigniew Leonowicz
Radomir Goňo
Elżbieta Jasińska
author_facet Alexander Vinogradov
Vadim Bolshev
Alina Vinogradova
Michał Jasiński
Tomasz Sikorski
Zbigniew Leonowicz
Radomir Goňo
Elżbieta Jasińska
author_sort Alexander Vinogradov
collection DOAJ
description This paper presents the analysis of power supply restoration time after failures occurring in power lines. It found that the power supply restoration time depends on several constituents, such as the time for obtaining information on failures, the time for information recognition, the time to repair failures, and the time for connection harmonization. All these constituents have been considered more specifically. The main constituents’ results values of the power supply restoration time were analyzed for the electrical networks of regional power supply company “Oreolenergo”, a branch of Interregional Distribution Grid Company (IDGC) of Center. The Delphi method was used for determining the time for obtaining information on failures as well as the time for information recognition. The method of mathematical statistics was used to determine the repair time. The determined power supply restoration time (5.28 h) is similar to statistical values of the examined power supply company (the deviation was equal to 9.9%). The technical means of electrical network automation capable of the reduction of the power supply restoration time have also been found. These means were classified according to the time intervals they shorten.
first_indexed 2024-03-10T19:29:18Z
format Article
id doaj.art-04e31ba36264463ca5a28a794537f1bd
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-03-10T19:29:18Z
publishDate 2020-05-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-04e31ba36264463ca5a28a794537f1bd2023-11-20T02:13:40ZengMDPI AGEnergies1996-10732020-05-011311273610.3390/en13112736Analysis of the Power Supply Restoration Time after Failures in Power Transmission LinesAlexander Vinogradov0Vadim Bolshev1Alina Vinogradova2Michał Jasiński3Tomasz Sikorski4Zbigniew Leonowicz5Radomir Goňo6Elżbieta Jasińska7Laboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, RussiaLaboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, RussiaLaboratory of Power Supply and Heat Supply, Federal Scientific Agroengineering Center VIM, 109428 Moscow, RussiaDepartment of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, PolandDepartment of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, PolandDepartment of Electrical Engineering Fundamentals, Faculty of Electrical Engineering, Wroclaw University of Science and Technology, 50-370 Wroclaw, PolandDepartment of Electrical Power Engineering, Faculty of Electrical Engineering and Computer Science, VSB-Technical University of Ostrava, 708 00 Ostrava, Czech RepublicFaculty of Law, Administration and Economics, University of Wroclaw, 50-145 Wroclaw, PolandThis paper presents the analysis of power supply restoration time after failures occurring in power lines. It found that the power supply restoration time depends on several constituents, such as the time for obtaining information on failures, the time for information recognition, the time to repair failures, and the time for connection harmonization. All these constituents have been considered more specifically. The main constituents’ results values of the power supply restoration time were analyzed for the electrical networks of regional power supply company “Oreolenergo”, a branch of Interregional Distribution Grid Company (IDGC) of Center. The Delphi method was used for determining the time for obtaining information on failures as well as the time for information recognition. The method of mathematical statistics was used to determine the repair time. The determined power supply restoration time (5.28 h) is similar to statistical values of the examined power supply company (the deviation was equal to 9.9%). The technical means of electrical network automation capable of the reduction of the power supply restoration time have also been found. These means were classified according to the time intervals they shorten.https://www.mdpi.com/1996-1073/13/11/2736power supply restorationpower supply outagesfailurestime intervalsobtaining informationinformation recognition
spellingShingle Alexander Vinogradov
Vadim Bolshev
Alina Vinogradova
Michał Jasiński
Tomasz Sikorski
Zbigniew Leonowicz
Radomir Goňo
Elżbieta Jasińska
Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
Energies
power supply restoration
power supply outages
failures
time intervals
obtaining information
information recognition
title Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
title_full Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
title_fullStr Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
title_full_unstemmed Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
title_short Analysis of the Power Supply Restoration Time after Failures in Power Transmission Lines
title_sort analysis of the power supply restoration time after failures in power transmission lines
topic power supply restoration
power supply outages
failures
time intervals
obtaining information
information recognition
url https://www.mdpi.com/1996-1073/13/11/2736
work_keys_str_mv AT alexandervinogradov analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT vadimbolshev analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT alinavinogradova analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT michałjasinski analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT tomaszsikorski analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT zbigniewleonowicz analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT radomirgono analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines
AT elzbietajasinska analysisofthepowersupplyrestorationtimeafterfailuresinpowertransmissionlines