Risk Analysis Method of Cascade Plants Operation in Medium Term Based on Multi-Scale Market and Settlement Rules
Due to the distribution of runoff is uneven and uncertain in time and space, there are huge differences between the electricity markets dominated by hydropower and thermal power. Therefore, how to evaluate the risk of cascade plants participating in electricity market is an urgent problem to be solv...
Main Authors: | Jia Lu, Gang Li, Chuntian Cheng, Haojianxiong Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9091591/ |
Similar Items
-
A long-term intelligent operation and management model of cascade hydropower stations based on chance constrained programming under multi-market coupling
by: Jia Lu, et al.
Published: (2021-01-01) -
Short-term power generation scheduling rules for cascade hydropower stations based on hybrid algorithm
by: Wei Xie, et al.
Published: (2012-03-01) -
Multi-Objective Optimal Long-Term Operation of Cascade Hydropower for Multi-Market Portfolio and Energy Stored at End of Year
by: Haojianxiong Yu, et al.
Published: (2023-01-01) -
Market bidding method for the inter-provincial delivery of cascaded hydroelectric plants in day-ahead markets considering settlement rules
by: Xu Han, et al.
Published: (2023-10-01) -
Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces
by: Jianjian Shen, et al.
Published: (2015-10-01)