A hybrid delayed differentiation multiproduct EPQ model with scrap and end-products multi-shipment policy
The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase...
Main Authors: | Yuan-Shyi Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2023-01-01
|
Series: | International Journal of Industrial Engineering Computations |
Online Access: | http://www.growingscience.com/ijiec/Vol14/IJIEC_2022_35.pdf |
Similar Items
-
Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime
by: Yuan-Shyi Peter Chiu, et al.
Published: (2022-01-01) -
Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
by: Yuan-Shyi P. Chiu, et al.
Published: (2023-01-01) -
Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps
by: Singa Wang Chiu, et al.
Published: (2019-03-01) -
The combined effect of rework, postponement, multiple shipments, and overtime producing common-component on a multiproduct vendor-client incorporated system
by: Yuan-Shyi Peter Chiu, et al.
Published: (2022-01-01) -
A delayed differentiation multiproduct model with the outsourcing of common parts, overtime strategy for end products, and quality reassurance
by: Chiu, Singa Wang, et al.
Published: (2021-01-01)