Materials Requirement Planning with the Use of Activity Based Costing

One of the rationalization areas is the material supply process. New tasks of material supply are: integration of supply with the operation of the entire system, especially at the product design stage, effective use of material resources, reduction of the level of supply costs from the point of view...

Full description

Bibliographic Details
Main Authors: Więcek Dorota, Więcek Dariusz, Dulina Luboslav
Format: Article
Language:English
Published: Sciendo 2020-03-01
Series:Management Systems in Production Engineering
Subjects:
Online Access:https://doi.org/10.2478/mspe-2020-0001
_version_ 1818047770508918784
author Więcek Dorota
Więcek Dariusz
Dulina Luboslav
author_facet Więcek Dorota
Więcek Dariusz
Dulina Luboslav
author_sort Więcek Dorota
collection DOAJ
description One of the rationalization areas is the material supply process. New tasks of material supply are: integration of supply with the operation of the entire system, especially at the product design stage, effective use of material resources, reduction of the level of supply costs from the point of view of production costs. In the conditions of unit and small batch production the materials requirement needs to be carefully planned and optimized due to the use of many different kinds, types and sizes of materials and dynamic changes of demand over time. In this situation there are needed tools enabling the measurement of production costs for particular tasks on the basis of currently realized processes. One of these tools is activity based costing which is a groundwork for decision making process in the material supply area. Basing on activity based costing, a model of materials requirements planning was developed, which considers minimizing the number of different kinds and sizes of materials by using alternative materials and, consequently, lowering production costs.
first_indexed 2024-12-10T10:11:04Z
format Article
id doaj.art-065eda192bbb43c4b76cbeebcda1ce5d
institution Directory Open Access Journal
issn 2450-5781
language English
last_indexed 2024-12-10T10:11:04Z
publishDate 2020-03-01
publisher Sciendo
record_format Article
series Management Systems in Production Engineering
spelling doaj.art-065eda192bbb43c4b76cbeebcda1ce5d2022-12-22T01:53:08ZengSciendoManagement Systems in Production Engineering2450-57812020-03-012813810.2478/mspe-2020-0001Materials Requirement Planning with the Use of Activity Based CostingWięcek Dorota0Więcek Dariusz1Dulina Luboslav2University of Bielsko-BialaUniversity of Bielsko-BialaUniversity of ZilinaOne of the rationalization areas is the material supply process. New tasks of material supply are: integration of supply with the operation of the entire system, especially at the product design stage, effective use of material resources, reduction of the level of supply costs from the point of view of production costs. In the conditions of unit and small batch production the materials requirement needs to be carefully planned and optimized due to the use of many different kinds, types and sizes of materials and dynamic changes of demand over time. In this situation there are needed tools enabling the measurement of production costs for particular tasks on the basis of currently realized processes. One of these tools is activity based costing which is a groundwork for decision making process in the material supply area. Basing on activity based costing, a model of materials requirements planning was developed, which considers minimizing the number of different kinds and sizes of materials by using alternative materials and, consequently, lowering production costs.https://doi.org/10.2478/mspe-2020-0001activity based costingplanning of material requirements
spellingShingle Więcek Dorota
Więcek Dariusz
Dulina Luboslav
Materials Requirement Planning with the Use of Activity Based Costing
Management Systems in Production Engineering
activity based costing
planning of material requirements
title Materials Requirement Planning with the Use of Activity Based Costing
title_full Materials Requirement Planning with the Use of Activity Based Costing
title_fullStr Materials Requirement Planning with the Use of Activity Based Costing
title_full_unstemmed Materials Requirement Planning with the Use of Activity Based Costing
title_short Materials Requirement Planning with the Use of Activity Based Costing
title_sort materials requirement planning with the use of activity based costing
topic activity based costing
planning of material requirements
url https://doi.org/10.2478/mspe-2020-0001
work_keys_str_mv AT wiecekdorota materialsrequirementplanningwiththeuseofactivitybasedcosting
AT wiecekdariusz materialsrequirementplanningwiththeuseofactivitybasedcosting
AT dulinaluboslav materialsrequirementplanningwiththeuseofactivitybasedcosting