Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France

Few commercial-scale carbon capture and storage (CCS) projects are currently operating in the world, with almost all in the USA and China. Despite a high number of CCS pilot-scale projects achieved in Europe, only two commercial-scale projects are operating today. The goal of this study is to presen...

Full description

Bibliographic Details
Main Authors: Fernanda M. L. Veloso, Isaline Gravaud, Frédéric A. Mathurin, Sabrine Ben Rhouma
Format: Article
Language:English
Published: MDPI AG 2022-05-01
Series:Clean Technologies
Subjects:
Online Access:https://www.mdpi.com/2571-8797/4/2/28
_version_ 1797488687417655296
author Fernanda M. L. Veloso
Isaline Gravaud
Frédéric A. Mathurin
Sabrine Ben Rhouma
author_facet Fernanda M. L. Veloso
Isaline Gravaud
Frédéric A. Mathurin
Sabrine Ben Rhouma
author_sort Fernanda M. L. Veloso
collection DOAJ
description Few commercial-scale carbon capture and storage (CCS) projects are currently operating in the world, with almost all in the USA and China. Despite a high number of CCS pilot-scale projects achieved in Europe, only two commercial-scale projects are operating today. The goal of this study is to present a case study in France to select a promising location to deploy a notable CCS pilot-scale project based on a multicriteria regional-scale approach. The methodology applied in this case study describes and assesses different aspects involved in CCS technology at the regional scale, and then an evaluation of economic key performance indicators (KPI) of CCS is carried out. The assessment at the regional scale gives an overview of where CCS could be applied, when CCS could be deployed and how to launch CCS considering the needs and concerns of stakeholders in the region. Technical aspects were mapped, such as the location of irreducible CO<sub>2</sub> sources and long-lasting emissions and the location of storage resources and existing potential transport infrastructures. We identified the waste-to-energy and chemical sectors as the main CO<sub>2</sub> sources in the region. An economic analysis of a hypothetical scenario of CCS deployment was elaborated considering three of the higher emitters in the region. A CCS scenario in the Paris Basin region with a deployment between 2027 and 2050 indicates a low CO<sub>2</sub> cost per ton avoided between 43 EUR/t and 70 EUR/t for a cumulated total of 25 Mt and 16 Mt, respectively, of CO<sub>2</sub> captured and stored for 26 years, including 7.7 Mt of CO<sub>2</sub> from biomass (potential negative emissions). Storage maturity and availability of the resource are the most uncertain parameters of the scenario, although they are the key elements to push investment in capture facilities and transport. Geological storage pilot projects are mandatory to prove storage resource and should be located in strategic locations close to potential CO<sub>2</sub> sources in case of confirmation of proven resources. Well-perceived pilot-scale projects are the first step to start engaging in deciding and investing in commercial-scale CCS projects.
first_indexed 2024-03-10T00:05:52Z
format Article
id doaj.art-0753be7ae79a4a4e900200a99e4ce1f6
institution Directory Open Access Journal
issn 2571-8797
language English
last_indexed 2024-03-10T00:05:52Z
publishDate 2022-05-01
publisher MDPI AG
record_format Article
series Clean Technologies
spelling doaj.art-0753be7ae79a4a4e900200a99e4ce1f62023-11-23T16:07:45ZengMDPI AGClean Technologies2571-87972022-05-014245847610.3390/cleantechnol4020028Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-FranceFernanda M. L. Veloso0Isaline Gravaud1Frédéric A. Mathurin2Sabrine Ben Rhouma3French Geological Survey (Bureau de Recherche Géologique et Minière—BRGM), 3 Avenue Claude Guillemin, CEDEX 2, 45060 Orléans, FranceFrench Geological Survey (Bureau de Recherche Géologique et Minière—BRGM), 3 Avenue Claude Guillemin, CEDEX 2, 45060 Orléans, FranceFrench Geological Survey (Bureau de Recherche Géologique et Minière—BRGM), 3 Avenue Claude Guillemin, CEDEX 2, 45060 Orléans, FranceFrench Geological Survey (Bureau de Recherche Géologique et Minière—BRGM), 3 Avenue Claude Guillemin, CEDEX 2, 45060 Orléans, FranceFew commercial-scale carbon capture and storage (CCS) projects are currently operating in the world, with almost all in the USA and China. Despite a high number of CCS pilot-scale projects achieved in Europe, only two commercial-scale projects are operating today. The goal of this study is to present a case study in France to select a promising location to deploy a notable CCS pilot-scale project based on a multicriteria regional-scale approach. The methodology applied in this case study describes and assesses different aspects involved in CCS technology at the regional scale, and then an evaluation of economic key performance indicators (KPI) of CCS is carried out. The assessment at the regional scale gives an overview of where CCS could be applied, when CCS could be deployed and how to launch CCS considering the needs and concerns of stakeholders in the region. Technical aspects were mapped, such as the location of irreducible CO<sub>2</sub> sources and long-lasting emissions and the location of storage resources and existing potential transport infrastructures. We identified the waste-to-energy and chemical sectors as the main CO<sub>2</sub> sources in the region. An economic analysis of a hypothetical scenario of CCS deployment was elaborated considering three of the higher emitters in the region. A CCS scenario in the Paris Basin region with a deployment between 2027 and 2050 indicates a low CO<sub>2</sub> cost per ton avoided between 43 EUR/t and 70 EUR/t for a cumulated total of 25 Mt and 16 Mt, respectively, of CO<sub>2</sub> captured and stored for 26 years, including 7.7 Mt of CO<sub>2</sub> from biomass (potential negative emissions). Storage maturity and availability of the resource are the most uncertain parameters of the scenario, although they are the key elements to push investment in capture facilities and transport. Geological storage pilot projects are mandatory to prove storage resource and should be located in strategic locations close to potential CO<sub>2</sub> sources in case of confirmation of proven resources. Well-perceived pilot-scale projects are the first step to start engaging in deciding and investing in commercial-scale CCS projects.https://www.mdpi.com/2571-8797/4/2/28CCS pilot-scaleCO<sub>2</sub> reductionIle-de-Franceregional scalewaste to energydecarbonizing industry
spellingShingle Fernanda M. L. Veloso
Isaline Gravaud
Frédéric A. Mathurin
Sabrine Ben Rhouma
Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
Clean Technologies
CCS pilot-scale
CO<sub>2</sub> reduction
Ile-de-France
regional scale
waste to energy
decarbonizing industry
title Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
title_full Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
title_fullStr Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
title_full_unstemmed Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
title_short Planning a Notable CCS Pilot-Scale Project: A Case Study in France, Paris Basin—Ile-de-France
title_sort planning a notable ccs pilot scale project a case study in france paris basin ile de france
topic CCS pilot-scale
CO<sub>2</sub> reduction
Ile-de-France
regional scale
waste to energy
decarbonizing industry
url https://www.mdpi.com/2571-8797/4/2/28
work_keys_str_mv AT fernandamlveloso planninganotableccspilotscaleprojectacasestudyinfranceparisbasiniledefrance
AT isalinegravaud planninganotableccspilotscaleprojectacasestudyinfranceparisbasiniledefrance
AT fredericamathurin planninganotableccspilotscaleprojectacasestudyinfranceparisbasiniledefrance
AT sabrinebenrhouma planninganotableccspilotscaleprojectacasestudyinfranceparisbasiniledefrance