System development for establishing shipyard mid-term production plans using backward process-centric simulation
In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was invest...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-01-01
|
Series: | International Journal of Naval Architecture and Ocean Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2092678219300433 |
_version_ | 1818412721360601088 |
---|---|
author | Suheon Ju Saenal Sung Huiqiang Shen Yong-Kuk Jeong Jong Gye Shin |
author_facet | Suheon Ju Saenal Sung Huiqiang Shen Yong-Kuk Jeong Jong Gye Shin |
author_sort | Suheon Ju |
collection | DOAJ |
description | In this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a one-year period. |
first_indexed | 2024-12-14T10:51:48Z |
format | Article |
id | doaj.art-07cd7cf99af745e88d4df0fa6cecc4a4 |
institution | Directory Open Access Journal |
issn | 2092-6782 |
language | English |
last_indexed | 2024-12-14T10:51:48Z |
publishDate | 2020-01-01 |
publisher | Elsevier |
record_format | Article |
series | International Journal of Naval Architecture and Ocean Engineering |
spelling | doaj.art-07cd7cf99af745e88d4df0fa6cecc4a42022-12-21T23:05:10ZengElsevierInternational Journal of Naval Architecture and Ocean Engineering2092-67822020-01-01122037System development for establishing shipyard mid-term production plans using backward process-centric simulationSuheon Ju0Saenal Sung1Huiqiang Shen2Yong-Kuk Jeong3Jong Gye Shin4Department of Naval Architecture and Ocean Engineering, Seoul National University, Gwanak-ro, Gwanak-gu, Seoul, 08826, Republic of KoreaHyundai Heavy Industry Co., 1000, Bangeojinsunhwando-ro, Dong-gu, Ulsan, 44032, Republic of KoreaDepartment of Naval Architecture and Ocean Engineering, Seoul National University, Gwanak-ro, Gwanak-gu, Seoul, 08826, Republic of Korea; Corresponding author.Department of Sustainable Production Development, KTH Royal Institute of Technology, Brinellvägen 8, 114 28, Stockholm, SwedenDepartment of Naval Architecture and Ocean Engineering, Seoul National University, Gwanak-ro, Gwanak-gu, Seoul, 08826, Republic of Korea; Research Institute of Marine System Engineering, Seoul National University, Gwanak-ro, Gwanak-gu, Seoul, 08826, Republic of KoreaIn this paper, we propose a simulation method based on backward simulation and process-oriented simulation to take into account the characteristics of shipbuilding production, which is an order-based industry with a job shop production environment. The shipyard production planning process was investigated to analyze the detailed process, variables and constraints of mid-term production planning. Backward and process-centric simulation methods were applied to the mid-term production planning process and an improved planning process, which considers the shipbuilding characteristics, was proposed. Based on the problem defined by applying backward process-centric simulation, a system which can conduct Discrete Event Simulation (DES) was developed. The developed mid-term planning system can be linked with the existing shipyard Advanced Planning System (APS). Verification of the system was performed with the actual shipyard mid-term production data for the four ships corresponding to a one-year period.http://www.sciencedirect.com/science/article/pii/S2092678219300433Shipyard production planningShipyard simulation systemShipyard advanced planning systemBackward simulationProcess-centric simulation |
spellingShingle | Suheon Ju Saenal Sung Huiqiang Shen Yong-Kuk Jeong Jong Gye Shin System development for establishing shipyard mid-term production plans using backward process-centric simulation International Journal of Naval Architecture and Ocean Engineering Shipyard production planning Shipyard simulation system Shipyard advanced planning system Backward simulation Process-centric simulation |
title | System development for establishing shipyard mid-term production plans using backward process-centric simulation |
title_full | System development for establishing shipyard mid-term production plans using backward process-centric simulation |
title_fullStr | System development for establishing shipyard mid-term production plans using backward process-centric simulation |
title_full_unstemmed | System development for establishing shipyard mid-term production plans using backward process-centric simulation |
title_short | System development for establishing shipyard mid-term production plans using backward process-centric simulation |
title_sort | system development for establishing shipyard mid term production plans using backward process centric simulation |
topic | Shipyard production planning Shipyard simulation system Shipyard advanced planning system Backward simulation Process-centric simulation |
url | http://www.sciencedirect.com/science/article/pii/S2092678219300433 |
work_keys_str_mv | AT suheonju systemdevelopmentforestablishingshipyardmidtermproductionplansusingbackwardprocesscentricsimulation AT saenalsung systemdevelopmentforestablishingshipyardmidtermproductionplansusingbackwardprocesscentricsimulation AT huiqiangshen systemdevelopmentforestablishingshipyardmidtermproductionplansusingbackwardprocesscentricsimulation AT yongkukjeong systemdevelopmentforestablishingshipyardmidtermproductionplansusingbackwardprocesscentricsimulation AT jonggyeshin systemdevelopmentforestablishingshipyardmidtermproductionplansusingbackwardprocesscentricsimulation |