Sediment management in tidal river: A case study of East Beel Khuksia, Bangladesh
The widespread construction of coastal embankments limited the natural deposition on the floodplain and accelerated the silt deposition in river channels. It resulted in drainage congestion and large-scale waterlogging problem. The temporary de-poldering is one of the effective methods to solve this...
Main Authors: | Talchabhadel Rocky, Nakagawa Hajime, Kawaike Kenji |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2018-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://doi.org/10.1051/e3sconf/20184002050 |
Similar Items
-
Tidal River Management (TRM) and Tidal Basin Management (TBM): A case study on Bangladesh
by: Talchabhadel Rocky, et al.
Published: (2016-01-01) -
The potential of Tidal River Management for flood alleviation in South Western Bangladesh
by: Adnan, MSG, et al.
Published: (2020) -
Appraising the Potential of Using Satellite‐Based Rainfall Estimates for Evaluating Extreme Precipitation: A Case Study of August 2014 Event Across the West Rapti River Basin, Nepal
by: Rocky Talchabhadel, et al.
Published: (2021-08-01) -
Fishing gears and methods in the Chalan Beel, Bangladesh
by: Nahid Sultana, et al.
Published: (2016-08-01) -
Fish and Shellfish Diversity of Malam Beel, Bangladesh: Status, Trends, and Management Strategies
by: Md. Samsul Alam, et al.
Published: (2023-10-01)