In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor
Newcleo is designing and building the next generation of nuclear lead-cooled fast reactors (LFRs) fueled with MOX. A fast-spectrum Small Modular Reactor of 30 MWe will be commissioned in 2030 (the Demonstrator) and a First-Of-Kind 200 MWe a few years later. To this end, newcleo develops an incremen...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | deu |
Published: |
NDT.net
2023-07-01
|
Series: | e-Journal of Nondestructive Testing |
Online Access: | https://www.ndt.net/search/docs.php3?id=28272 |
_version_ | 1797776487400603648 |
---|---|
author | Andrea Barbensi Jean-Sébastien Genot Simone Nardi Mariano Tarantino |
author_facet | Andrea Barbensi Jean-Sébastien Genot Simone Nardi Mariano Tarantino |
author_sort | Andrea Barbensi |
collection | DOAJ |
description |
Newcleo is designing and building the next generation of nuclear lead-cooled fast reactors (LFRs) fueled with MOX. A fast-spectrum Small Modular Reactor of 30 MWe will be commissioned in 2030 (the Demonstrator) and a First-Of-Kind 200 MWe a few years later. To this end, newcleo develops an incremental strategy, starting first with the consolidation of mature and promising technologies with its own R&D laboratories and collaborations with major institutes and companies. This step aims to demonstrate the applicability of chosen technologies to a full mock-up of the reactor (the Precursor) available in 2026 for experiments. Inclusion of ISI&R (In Service Inspection and Repair) at the earliest stages of designs is a necessity to achieve a sufficient level of maturity and confidence in the technologies, and to increase safety, availability, and preservation of investments of experimental devices and reactors during their whole life.
|
first_indexed | 2024-03-12T22:50:40Z |
format | Article |
id | doaj.art-084a754647ce45c8b4f2387deaf3e528 |
institution | Directory Open Access Journal |
issn | 1435-4934 |
language | deu |
last_indexed | 2024-03-12T22:50:40Z |
publishDate | 2023-07-01 |
publisher | NDT.net |
record_format | Article |
series | e-Journal of Nondestructive Testing |
spelling | doaj.art-084a754647ce45c8b4f2387deaf3e5282023-07-20T11:42:23ZdeuNDT.nete-Journal of Nondestructive Testing1435-49342023-07-0128710.58286/28272In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast ReactorAndrea BarbensiJean-Sébastien GenotSimone NardiMariano Tarantino Newcleo is designing and building the next generation of nuclear lead-cooled fast reactors (LFRs) fueled with MOX. A fast-spectrum Small Modular Reactor of 30 MWe will be commissioned in 2030 (the Demonstrator) and a First-Of-Kind 200 MWe a few years later. To this end, newcleo develops an incremental strategy, starting first with the consolidation of mature and promising technologies with its own R&D laboratories and collaborations with major institutes and companies. This step aims to demonstrate the applicability of chosen technologies to a full mock-up of the reactor (the Precursor) available in 2026 for experiments. Inclusion of ISI&R (In Service Inspection and Repair) at the earliest stages of designs is a necessity to achieve a sufficient level of maturity and confidence in the technologies, and to increase safety, availability, and preservation of investments of experimental devices and reactors during their whole life. https://www.ndt.net/search/docs.php3?id=28272 |
spellingShingle | Andrea Barbensi Jean-Sébastien Genot Simone Nardi Mariano Tarantino In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor e-Journal of Nondestructive Testing |
title | In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor |
title_full | In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor |
title_fullStr | In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor |
title_full_unstemmed | In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor |
title_short | In-Service Inspection & Repair strategy for newcleo Lead-cooled Fast Reactor |
title_sort | in service inspection amp repair strategy for newcleo lead cooled fast reactor |
url | https://www.ndt.net/search/docs.php3?id=28272 |
work_keys_str_mv | AT andreabarbensi inserviceinspectionamprepairstrategyfornewcleoleadcooledfastreactor AT jeansebastiengenot inserviceinspectionamprepairstrategyfornewcleoleadcooledfastreactor AT simonenardi inserviceinspectionamprepairstrategyfornewcleoleadcooledfastreactor AT marianotarantino inserviceinspectionamprepairstrategyfornewcleoleadcooledfastreactor |