Worker dose under high-power operation of the J-PARC 3 GeV Rapid Cycling Synchrotron

The J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) delivers a 1-MW, high-intensity beam to facilities downstream. In such high-intensity accelerators, the operational beam intensity is limited to keep worker exposure to the residual dose within acceptable tolerances. Therefore, we continue to pursue a...

Full description

Bibliographic Details
Main Author: Yamamoto Kazami
Format: Article
Language:English
Published: EDP Sciences 2017-01-01
Series:EPJ Web of Conferences
Online Access:https://doi.org/10.1051/epjconf/201715307022
Description
Summary:The J-PARC 3 GeV Rapid Cycling Synchrotron (RCS) delivers a 1-MW, high-intensity beam to facilities downstream. In such high-intensity accelerators, the operational beam intensity is limited to keep worker exposure to the residual dose within acceptable tolerances. Therefore, we continue to pursue accelerator commissioning that reduces beam loss. In order to achieve further high-intensity operation, the J-PARC accelerator system has been drastically upgraded over the past two years. As a result, it was found that beam loss decreased, whereas output power increased; the residual doses were kept at the same level or decreased in RCS. A malfunction of a collimator occurred in April 2016, and we replaced it to a spare duct in a hurry. The broken collimator was higher activated, but exposure to workers was kept within the acceptable level.
ISSN:2100-014X