Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets

The development of land subsidence has seriously affected the safe operation of Beijing-Tianjin high-speed railway. The South-to-North Water Diversion Project Central Route (SNWDP-CR) was officially put into operation in December 2014. It has changed the water supply pattern in Beijing and provided...

Full description

Bibliographic Details
Main Authors: Shaomin Liu, Mingzhou Bai
Format: Article
Language:English
Published: Frontiers Media S.A. 2024-03-01
Series:Frontiers in Earth Science
Subjects:
Online Access:https://www.frontiersin.org/articles/10.3389/feart.2024.1372105/full
_version_ 1797265158331957248
author Shaomin Liu
Shaomin Liu
Shaomin Liu
Mingzhou Bai
Mingzhou Bai
author_facet Shaomin Liu
Shaomin Liu
Shaomin Liu
Mingzhou Bai
Mingzhou Bai
author_sort Shaomin Liu
collection DOAJ
description The development of land subsidence has seriously affected the safe operation of Beijing-Tianjin high-speed railway. The South-to-North Water Diversion Project Central Route (SNWDP-CR) was officially put into operation in December 2014. It has changed the water supply pattern in Beijing and provided conditions for reducing groundwater exploitation and controlling land subsidence. In this paper, the time-series interferometric data, in situ monitoring data of recent 20 years and the basic geological datasets are combined to compare and analyze the changes of groundwater level, land subsidence and the main subsidence layers along the Beijing-Tianjin high-speed railway before and after the SNWDP-CR. The effects of the environment of Quaternary sedimentary, groundwater exploitation and soil deformation of different lithology on land subsidence along the high-speed railway under the background of new water conditions are revealed. The main conclusions are as follows: 1) The serious land subsidence area along the Beijing-Tianjin high-speed railway always concentrated in the section of DK11-DK23. After the operation of SNWDP-CR, the land subsidence along the railway generally showed a slowing trend. The maximum subsidence rate was reduced from 80 mm/yr to 49 mm/yr. The length of subsidence rate that more than 50 mm/yr of the section was reduced from 8.0 km to 0 km. 2) The groundwater level of different aquifer groups along the Beijing-Tianjin high-speed railway rose and declined before and after the SNWDP-CR. in eastern part of the plain, the groundwater level of each aquifer group has changed from a continuous decline (range 0.13–1.82 m) to a gradual rise (range 0.45–1.87 m) since 2017. However, in the southeast of the plain, the groundwater level still showed a continuous decline trend, with an average annual decline of 1.2–1.8 m. 3) From 2006 to 2019, the subsidence of the first, second and third compression layer group along the railway accounted for 2.71%, 28.29% and 69%, respectively. The third compression layer group (monitoring layer 94–182 m) had the largest subsidence proportion and was the main subsidence layer. 4) The land subsidence along the Beijing-Tianjin high-speed railway is controlled by the basement structure. The difference of groundwater exploitation intensity led to differences in the spatial distribution of land subsidence along the railway. The subsidence of the soil layer below the bearing layer (about 50 m) of the high-speed railway pile foundation exhibited the characteristics of viscoplastic or viscoelastic plasticity deformation. This section of strata is a key layer that needs to be considered for land subsidence control along the Beijing-Tianjin high-speed railway in the future.
first_indexed 2024-04-25T00:40:21Z
format Article
id doaj.art-096c0ce7247b44a69dd1d29907b4d114
institution Directory Open Access Journal
issn 2296-6463
language English
last_indexed 2024-04-25T00:40:21Z
publishDate 2024-03-01
publisher Frontiers Media S.A.
record_format Article
series Frontiers in Earth Science
spelling doaj.art-096c0ce7247b44a69dd1d29907b4d1142024-03-12T11:11:24ZengFrontiers Media S.A.Frontiers in Earth Science2296-64632024-03-011210.3389/feart.2024.13721051372105Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasetsShaomin Liu0Shaomin Liu1Shaomin Liu2Mingzhou Bai3Mingzhou Bai4School of Civil Engineering, Beijing Jiaotong University, Beijing, ChinaBeijing Urban Rail Transit Safety and Disaster Prevention Engineering and Technology Research Center, Beijing, ChinaBeijing Institute of Geology and Mineral Exploration, Beijing, ChinaSchool of Civil Engineering, Beijing Jiaotong University, Beijing, ChinaBeijing Urban Rail Transit Safety and Disaster Prevention Engineering and Technology Research Center, Beijing, ChinaThe development of land subsidence has seriously affected the safe operation of Beijing-Tianjin high-speed railway. The South-to-North Water Diversion Project Central Route (SNWDP-CR) was officially put into operation in December 2014. It has changed the water supply pattern in Beijing and provided conditions for reducing groundwater exploitation and controlling land subsidence. In this paper, the time-series interferometric data, in situ monitoring data of recent 20 years and the basic geological datasets are combined to compare and analyze the changes of groundwater level, land subsidence and the main subsidence layers along the Beijing-Tianjin high-speed railway before and after the SNWDP-CR. The effects of the environment of Quaternary sedimentary, groundwater exploitation and soil deformation of different lithology on land subsidence along the high-speed railway under the background of new water conditions are revealed. The main conclusions are as follows: 1) The serious land subsidence area along the Beijing-Tianjin high-speed railway always concentrated in the section of DK11-DK23. After the operation of SNWDP-CR, the land subsidence along the railway generally showed a slowing trend. The maximum subsidence rate was reduced from 80 mm/yr to 49 mm/yr. The length of subsidence rate that more than 50 mm/yr of the section was reduced from 8.0 km to 0 km. 2) The groundwater level of different aquifer groups along the Beijing-Tianjin high-speed railway rose and declined before and after the SNWDP-CR. in eastern part of the plain, the groundwater level of each aquifer group has changed from a continuous decline (range 0.13–1.82 m) to a gradual rise (range 0.45–1.87 m) since 2017. However, in the southeast of the plain, the groundwater level still showed a continuous decline trend, with an average annual decline of 1.2–1.8 m. 3) From 2006 to 2019, the subsidence of the first, second and third compression layer group along the railway accounted for 2.71%, 28.29% and 69%, respectively. The third compression layer group (monitoring layer 94–182 m) had the largest subsidence proportion and was the main subsidence layer. 4) The land subsidence along the Beijing-Tianjin high-speed railway is controlled by the basement structure. The difference of groundwater exploitation intensity led to differences in the spatial distribution of land subsidence along the railway. The subsidence of the soil layer below the bearing layer (about 50 m) of the high-speed railway pile foundation exhibited the characteristics of viscoplastic or viscoelastic plasticity deformation. This section of strata is a key layer that needs to be considered for land subsidence control along the Beijing-Tianjin high-speed railway in the future.https://www.frontiersin.org/articles/10.3389/feart.2024.1372105/fullland subsidencehigh-speed railwaywater diversion projectgroundwater levelsoil deformation characteristics
spellingShingle Shaomin Liu
Shaomin Liu
Shaomin Liu
Mingzhou Bai
Mingzhou Bai
Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
Frontiers in Earth Science
land subsidence
high-speed railway
water diversion project
groundwater level
soil deformation characteristics
title Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
title_full Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
title_fullStr Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
title_full_unstemmed Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
title_short Land subsidence along the Beijing-Tianjin high-speed railway before and after the South-to-North water diversion project with multi-source monitoring datasets
title_sort land subsidence along the beijing tianjin high speed railway before and after the south to north water diversion project with multi source monitoring datasets
topic land subsidence
high-speed railway
water diversion project
groundwater level
soil deformation characteristics
url https://www.frontiersin.org/articles/10.3389/feart.2024.1372105/full
work_keys_str_mv AT shaominliu landsubsidencealongthebeijingtianjinhighspeedrailwaybeforeandafterthesouthtonorthwaterdiversionprojectwithmultisourcemonitoringdatasets
AT shaominliu landsubsidencealongthebeijingtianjinhighspeedrailwaybeforeandafterthesouthtonorthwaterdiversionprojectwithmultisourcemonitoringdatasets
AT shaominliu landsubsidencealongthebeijingtianjinhighspeedrailwaybeforeandafterthesouthtonorthwaterdiversionprojectwithmultisourcemonitoringdatasets
AT mingzhoubai landsubsidencealongthebeijingtianjinhighspeedrailwaybeforeandafterthesouthtonorthwaterdiversionprojectwithmultisourcemonitoringdatasets
AT mingzhoubai landsubsidencealongthebeijingtianjinhighspeedrailwaybeforeandafterthesouthtonorthwaterdiversionprojectwithmultisourcemonitoringdatasets