Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS

In view of problem existed in SCADA-EMS power dispatching system of coal mine that time between master station and RTU of remote substation can not synchronization to influence accuracy of collected data, the paper proposed a design scheme of SCADA-EMS power dispatching system of coal mine based on...

Full description

Bibliographic Details
Main Authors: LV Qi-ming, XIA Yuan-tao, WANG Xiao-chen, WANG Yu-feng
Format: Article
Language:zho
Published: Editorial Department of Industry and Mine Automation 2011-03-01
Series:Gong-kuang zidonghua
Subjects:
Online Access:http://www.gkzdh.cn/article/id/2712
_version_ 1797868401639555072
author LV Qi-ming
XIA Yuan-tao
WANG Xiao-chen
WANG Yu-feng
author_facet LV Qi-ming
XIA Yuan-tao
WANG Xiao-chen
WANG Yu-feng
author_sort LV Qi-ming
collection DOAJ
description In view of problem existed in SCADA-EMS power dispatching system of coal mine that time between master station and RTU of remote substation can not synchronization to influence accuracy of collected data, the paper proposed a design scheme of SCADA-EMS power dispatching system of coal mine based on GPS. The system real-timely monitors operation condition of power system through SCADA-EMS and can make remote access through client, and uses method combining GPS with PLL to realize real-time performance and accuracy of collected AC data of RTU. The actual application showed that the system can ensure stable operation of power system of coal mine effectively.
first_indexed 2024-04-09T23:56:27Z
format Article
id doaj.art-09bdc4a6b92944dd8cc62f84905510dd
institution Directory Open Access Journal
issn 1671-251X
language zho
last_indexed 2024-04-09T23:56:27Z
publishDate 2011-03-01
publisher Editorial Department of Industry and Mine Automation
record_format Article
series Gong-kuang zidonghua
spelling doaj.art-09bdc4a6b92944dd8cc62f84905510dd2023-03-17T02:41:47ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2011-03-013739194Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPSLV Qi-mingXIA Yuan-taoWANG Xiao-chenWANG Yu-fengIn view of problem existed in SCADA-EMS power dispatching system of coal mine that time between master station and RTU of remote substation can not synchronization to influence accuracy of collected data, the paper proposed a design scheme of SCADA-EMS power dispatching system of coal mine based on GPS. The system real-timely monitors operation condition of power system through SCADA-EMS and can make remote access through client, and uses method combining GPS with PLL to realize real-time performance and accuracy of collected AC data of RTU. The actual application showed that the system can ensure stable operation of power system of coal mine effectively.http://www.gkzdh.cn/article/id/2712power system of coal mine, power dispatching, dispatching automation, scada-ems, gps, pll, rtu
spellingShingle LV Qi-ming
XIA Yuan-tao
WANG Xiao-chen
WANG Yu-feng
Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
Gong-kuang zidonghua
power system of coal mine, power dispatching, dispatching automation, scada-ems, gps, pll, rtu
title Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
title_full Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
title_fullStr Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
title_full_unstemmed Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
title_short Design of SCADA-EMS Power Dispatching System of Coal Mine Based on GPS
title_sort design of scada ems power dispatching system of coal mine based on gps
topic power system of coal mine, power dispatching, dispatching automation, scada-ems, gps, pll, rtu
url http://www.gkzdh.cn/article/id/2712
work_keys_str_mv AT lvqiming designofscadaemspowerdispatchingsystemofcoalminebasedongps
AT xiayuantao designofscadaemspowerdispatchingsystemofcoalminebasedongps
AT wangxiaochen designofscadaemspowerdispatchingsystemofcoalminebasedongps
AT wangyufeng designofscadaemspowerdispatchingsystemofcoalminebasedongps