Quantify the Impact of Line Capacity Temporary Expansion on Blackout Risk by the State-Failure–Network Method

The blackout risks of cascading failures in power systems are notably associated with the failures of transmission lines. Line capacity temporary expansion can reduce blackout risk by decreasing the line failures due to the overloads during the cascading failures. To efficiently quantify the impact...

Full description

Bibliographic Details
Main Authors: Linzhi Li, Hao Wu, Yonghua Song, Dunwen Song, Yi Liu
Format: Article
Language:English
Published: IEEE 2019-01-01
Series:IEEE Access
Subjects:
Online Access:https://ieeexplore.ieee.org/document/8935204/
Description
Summary:The blackout risks of cascading failures in power systems are notably associated with the failures of transmission lines. Line capacity temporary expansion can reduce blackout risk by decreasing the line failures due to the overloads during the cascading failures. To efficiently quantify the impact of line capacity temporary expansion on blackout risks, we propose a data based state-failure-network method in this paper. The state-failure network, which is formed by the cascading failure data generated by cascading failure simulations, contains the empirical probabilities that correspond to the failure probabilities of lines. Since implementing line capacity temporary expansion to the system can change the failure probabilities of lines and reduce the blackout risk, the empirical probabilities offer the link between line capacity temporary expansion and state-failure network. By updating the values in the state-failure network with changed empirical probabilities, the blackout risk after line capacity temporary expansion is implemented can be efficiently worked out by state-failure network. Thus, the impact of line capacity temporary expansion on blackout risk is quantified by comparing the newly calculated blackout risk with the risk before the line capacity temporary expansion is implemented. The advantage of the proposed method lies in the high accuracy and efficiency of quantifying the impacts of any line capacity temporary expansion schemes once the state-failure network is formed. Case studies verify the accuracy and efficiency of the proposed method.
ISSN:2169-3536