INFLUENCE OF THE MODERN SYSTEMS OF THE BLAST STEEL-FURNACE ELECTRICAL PARAMETERS CONTROL ON CAPACITY AND TECHNICAL AND ECONOMICAL INDICES OF MELTING
The reduction of time under the current, electric energy rate, electrodes rate at working of arc steel-furnace with new transformer of capacity 95 MBA and with regulating system SIMELT-AC-NEC are noted.
Main Authors: | D. N. Andrianov, V. N. Prohorenko, A. S. Zazjan |
---|---|
Format: | Article |
Language: | English |
Published: |
Belarusian National Technical University
2006-11-01
|
Series: | Litʹë i Metallurgiâ |
Online Access: | https://lim.bntu.by/jour/article/view/1689 |
Similar Items
-
REDUCTION OF POWER INPUTS AT STEEL CASTING IN POWERFUL LARGE-TONNAGE BLAST STEELMAKING FURNACES OF RUP «BELORUSSIAN METALLURGICAL WORKS»
by: A. S. Zazjan, et al.
Published: (2010-05-01) -
MELTING OF LUMP MATERIAL IN IRON-CARBON MELT IN THE PROCESS OF MELTING IN BLAST STEEL FURNACE
by: V. I. Timoshpolskij, et al.
Published: (2007-08-01) -
TO THE MATTER OF APPRAISAL OF TECHNICAL-ECONOMIC INDICES OF STEEL-MELTING FURNACES OF CONSTANT AND ALTERNATING CURRENT
by: Andrej I. Rozhkov, et al.
Published: (2010-05-01) -
THE WAYS OF INCREASE OF THE MODEM ARC STEEL-MAKING FURNACES CAPACITY
by: V. A. Matochkin, et al.
Published: (2005-08-01) -
THERMODYNAMICS OF CHEMICAL PROCESSES OF PHOSPHORUS ALLOCATION DURING THE PROCESS OF MELTING IN STEEL-MAKING FURNACES
by: V. F. Sobolev, et al.
Published: (2006-05-01)