Dynamic Tasks Scheduling Model of UAV Cluster Based on Flexible Network Architecture
With the rapid growth of application demands and the real-time change of environmental situations, the defects of the UAV task network in adaptability, flexibility, and resilience are becoming more and more prominent. The current network architecture that the junction of points and lines is fixed ca...
Main Authors: | Ting Duan, Weiping Wang, Tao Wang, Xiaofan Chen, Xiaobo Li |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9117102/ |
Similar Items
-
A Task Planning Method for UAV Swarm Dynamic Reconstruction Based on a Fourth-Order Motif
by: Ting Duan, et al.
Published: (2023-01-01) -
Criticality-cognizant Clustering-based Task Scheduling on Multicore Processors in the Avionics Domain
by: K. Nagalakshmi, et al.
Published: (2018-01-01) -
ELABORATION OF TASK CONTROL ALGORITHMS WITH PARALLEL COMPUTING IN CLUSTER COMPUTING SYSTEMS
by: Abdulmajed A. Al-khulaidi, et al.
Published: (2018-07-01) -
Multi-flexible integrated scheduling algorithm for multi-flexible integrated scheduling problem with setup times
by: Dan Yang, et al.
Published: (2023-03-01) -
SCALABLE LOW COMPLEXITY TASK SCHEDULING ALGORITHM FOR CLUSTER OF WORKSTATIONS
by: S. PADMAVATHI, et al.
Published: (2010-09-01)