Model Hub Median Problem Dengan Batasan Travel Time
This article describes the development of an uncapacitated p-hub median problem model. The established model will be applied in determining the location of the hub. Generally in the median p-hub model problem, it is known that the number of hubs built with the total cost minimization function. In th...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2017-08-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/4531 |
_version_ | 1811285653626814464 |
---|---|
author | Faisal Ibrahim Ahmad Rusdiansyah |
author_facet | Faisal Ibrahim Ahmad Rusdiansyah |
author_sort | Faisal Ibrahim |
collection | DOAJ |
description | This article describes the development of an uncapacitated p-hub median problem model. The established model will be applied in determining the location of the hub. Generally in the median p-hub model problem, it is known that the number of hubs built with the total cost minimization function. In this developed model, there is no limit to the number of hubs and the function of the intended destination is how many hubs are built. The model also looks for where the hub location will be built and which nodes are allocated to each hub. By eliminating the limitation of the number of hubs built, the model adds a total total timeout limit. The numerical experiments are dealing with the model. The solution to solve the model using excel solver. So that it will be designed spread sheet excel appropriate model. In numerical experiments, dummy data representing real systems will be used with the aim of shortening computational time. Numerical experiments are performed in several conditions scenarios. Computational results generate the location of hubs and nodes allocated to each hub with various experimental scenarios. |
first_indexed | 2024-04-13T02:48:15Z |
format | Article |
id | doaj.art-0d82f890e0a549ac9d10fe9dd8541895 |
institution | Directory Open Access Journal |
issn | 1978-1431 2527-4112 |
language | English |
last_indexed | 2024-04-13T02:48:15Z |
publishDate | 2017-08-01 |
publisher | Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang |
record_format | Article |
series | Jurnal Teknik Industri |
spelling | doaj.art-0d82f890e0a549ac9d10fe9dd85418952022-12-22T03:05:56ZengJurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah MalangJurnal Teknik Industri1978-14312527-41122017-08-011811810.22219/JTIUMM.Vol18.No1.1-83847Model Hub Median Problem Dengan Batasan Travel TimeFaisal Ibrahim0Ahmad RusdiansyahJurusan Teknik Industri, Fakultas Teknologi Industri, Institut Teknologi Sepuluh NopemberThis article describes the development of an uncapacitated p-hub median problem model. The established model will be applied in determining the location of the hub. Generally in the median p-hub model problem, it is known that the number of hubs built with the total cost minimization function. In this developed model, there is no limit to the number of hubs and the function of the intended destination is how many hubs are built. The model also looks for where the hub location will be built and which nodes are allocated to each hub. By eliminating the limitation of the number of hubs built, the model adds a total total timeout limit. The numerical experiments are dealing with the model. The solution to solve the model using excel solver. So that it will be designed spread sheet excel appropriate model. In numerical experiments, dummy data representing real systems will be used with the aim of shortening computational time. Numerical experiments are performed in several conditions scenarios. Computational results generate the location of hubs and nodes allocated to each hub with various experimental scenarios.http://ejournal.umm.ac.id/index.php/industri/article/view/4531Uncapacitated hub, travel time, median problem. |
spellingShingle | Faisal Ibrahim Ahmad Rusdiansyah Model Hub Median Problem Dengan Batasan Travel Time Jurnal Teknik Industri Uncapacitated hub, travel time, median problem. |
title | Model Hub Median Problem Dengan Batasan Travel Time |
title_full | Model Hub Median Problem Dengan Batasan Travel Time |
title_fullStr | Model Hub Median Problem Dengan Batasan Travel Time |
title_full_unstemmed | Model Hub Median Problem Dengan Batasan Travel Time |
title_short | Model Hub Median Problem Dengan Batasan Travel Time |
title_sort | model hub median problem dengan batasan travel time |
topic | Uncapacitated hub, travel time, median problem. |
url | http://ejournal.umm.ac.id/index.php/industri/article/view/4531 |
work_keys_str_mv | AT faisalibrahim modelhubmedianproblemdenganbatasantraveltime AT ahmadrusdiansyah modelhubmedianproblemdenganbatasantraveltime |