DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD

In this paper, an organization with single grade subjected to exodus of personnel due to policy decisions taken by it, is considered. Here the problem of time to recruitment for this organization is analysed when the breakdown threshold, a level of maximum allowable manpower depletion, has two comp...

Full description

Bibliographic Details
Main Authors: Jayanthi L S, Uma K P
Format: Article
Language:English
Published: European Alliance for Innovation (EAI) 2018-09-01
Series:EAI Endorsed Transactions on Energy Web
Subjects:
Online Access:https://publications.eai.eu/index.php/ew/article/view/955
_version_ 1798044150903341056
author Jayanthi L S
Uma K P
author_facet Jayanthi L S
Uma K P
author_sort Jayanthi L S
collection DOAJ
description In this paper, an organization with single grade subjected to exodus of personnel due to policy decisions taken by it, is considered. Here the problem of time to recruitment for this organization is analysed when the breakdown threshold, a level of maximum allowable manpower depletion, has two components namely normal threshold of depletion of manpower, threshold of frequent breaks of existing workers and threshold of backup or reservation of manpower sources. In any organization when the policy decisions related to emoluments, benefits and objectives are announced then the exit of personnel is occurred. When the exit of personnel occurs, time overwhelming and expense happened for the recruitment, so that the recruitment cannot introduced in real time and also frequent recruitment are not encouraged, when the cumulative loss of manpower on critical occasion cross the level called as threshold, then only the recruitment is introduced and made. A mathematical model is developed using univarity policy of recruitment based on shock model approach in this paper. The inter-policy decision times and the inter-transfer decision times form same renewal process for three grades to obtain the mean variance of the time to recruitment. Mathematical equations for mean time to recruitment are developed using Laplace transform.
first_indexed 2024-04-11T22:58:56Z
format Article
id doaj.art-0e1b29a9bfe54891b912b66274891968
institution Directory Open Access Journal
issn 2032-944X
language English
last_indexed 2024-04-11T22:58:56Z
publishDate 2018-09-01
publisher European Alliance for Innovation (EAI)
record_format Article
series EAI Endorsed Transactions on Energy Web
spelling doaj.art-0e1b29a9bfe54891b912b662748919682022-12-22T03:58:15ZengEuropean Alliance for Innovation (EAI)EAI Endorsed Transactions on Energy Web2032-944X2018-09-0152010.4108/eai.12-9-2018.155563DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLDJayanthi L S0Uma K P1Christ Nagar CollegeHindustan Institute of Technology and Science In this paper, an organization with single grade subjected to exodus of personnel due to policy decisions taken by it, is considered. Here the problem of time to recruitment for this organization is analysed when the breakdown threshold, a level of maximum allowable manpower depletion, has two components namely normal threshold of depletion of manpower, threshold of frequent breaks of existing workers and threshold of backup or reservation of manpower sources. In any organization when the policy decisions related to emoluments, benefits and objectives are announced then the exit of personnel is occurred. When the exit of personnel occurs, time overwhelming and expense happened for the recruitment, so that the recruitment cannot introduced in real time and also frequent recruitment are not encouraged, when the cumulative loss of manpower on critical occasion cross the level called as threshold, then only the recruitment is introduced and made. A mathematical model is developed using univarity policy of recruitment based on shock model approach in this paper. The inter-policy decision times and the inter-transfer decision times form same renewal process for three grades to obtain the mean variance of the time to recruitment. Mathematical equations for mean time to recruitment are developed using Laplace transform. https://publications.eai.eu/index.php/ew/article/view/955Three grade systemtwo sources of depletionunivariate policy of recruitmentrenewal process
spellingShingle Jayanthi L S
Uma K P
DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
EAI Endorsed Transactions on Energy Web
Three grade system
two sources of depletion
univariate policy of recruitment
renewal process
title DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
title_full DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
title_fullStr DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
title_full_unstemmed DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
title_short DETERMINATION OF MANPOWER MODEL FOR A SINGLE GRADE SYSTEM WITH TWO SOURCES OF DEPLETION AND TWO COMPONENTS FOR THRESHOLD
title_sort determination of manpower model for a single grade system with two sources of depletion and two components for threshold
topic Three grade system
two sources of depletion
univariate policy of recruitment
renewal process
url https://publications.eai.eu/index.php/ew/article/view/955
work_keys_str_mv AT jayanthils determinationofmanpowermodelforasinglegradesystemwithtwosourcesofdepletionandtwocomponentsforthreshold
AT umakp determinationofmanpowermodelforasinglegradesystemwithtwosourcesofdepletionandtwocomponentsforthreshold