DEVELOPMENT OF THE SCHEME OF THE RIGGING AND ASSEMBLY INSTALLATION
In the conditions of reconstruction or technical re-equipment of grain storage and processing enterprises, there are cases of absence or impossibility of using the necessary universal lifting and transport means, in particular, construction tower or selfpropelled jib cranes at the installation sites...
Main Authors: | L. SOLDATENKO, A. SHIPKO, I. SHIPKO |
---|---|
Format: | Article |
Language: | English |
Published: |
Odesa National University of Technology
2023-03-01
|
Series: | Zernovì Produkti ì Kombìkorma |
Subjects: | |
Online Access: | https://journals.ontu.edu.ua/index.php/gpmf/article/view/2465 |
Similar Items
-
The dynamic loading study of a mobile transport and technological machine, placed on a slope
by: Khimich A.V., et al.
Published: (2022-06-01) -
Centralized control system for winch of mine hoister
by: GAO Yu
Published: (2013-01-01) -
EFFECT OF MOUNT POSITION OF MAIN WINCH ON DRILLING MAST HYDRAULIC CYLINDER LOAD IN ROTARY DRILLING RIG
by: ZHANG Hua, et al.
Published: (2015-01-01) -
Load Assessment Method for Multi-Layer Oceanographic Winch with Synthetic Fibre Ropes Based on Non-Rotation Symmetric Cylindrical Model
by: Haoran Ye, et al.
Published: (2024-02-01) -
Cable Tensile Forces Associated to Winch Design in Tethered Harvesting Operations: A Case Study from the Pacific North West
by: Omar Mologni, et al.
Published: (2021-06-01)