Multi-mode multi-skill resource-constrained project scheduling problem with differentiated professional capabilities
Motivated by a practical situation in a digital transformation project, this paper considers a resource-constrained project scheduling problem with multiple modes, multiple skill types, and differentiated professional capabilities. In the proposed problem, each project activity has one or m...
Main Authors: | Chunhao Li, Feng Wang, Tsuiping Chung |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2024-01-01
|
Series: | Journal of Project Management |
Online Access: | http://www.growingscience.com/jpm/Vol9/jpm_2023_13.pdf |
Similar Items
-
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
by: Denis Pinha, et al.
Published: (2016-11-01) -
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
by: Denis Pinha, et al.
Published: (2016-11-01) -
Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems
by: Muritala Adebayo Isah, et al.
Published: (2021-01-01) -
Hybrid evolutionary algorithm for multi-mode resource-constrained project scheduling problem
by: Marshal, Brian.
Published: (2011) -
Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability
by: Min Wang, et al.
Published: (2022-08-01)