Selection of formwork options when constructing high-rise buildings by AHP method (Case Study: Cao Lanh city, Vietnam)

Selecting the right construction formwork solution is vital to the success of a construction project. It can help speed up the construction schedule, boost quality, reduce construction costs, and ensure the safety of workers on the construction site. Construction contractors should carefully conside...

Full description

Bibliographic Details
Main Authors: Tran Ngoc-Long, Le Xuan-Vinh, Nguyen Van-Hoa
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Subjects:
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/47/e3sconf_form2023_02049.pdf
Description
Summary:Selecting the right construction formwork solution is vital to the success of a construction project. It can help speed up the construction schedule, boost quality, reduce construction costs, and ensure the safety of workers on the construction site. Construction contractors should carefully consider the project’s characteristics and their capacity when selecting the most suitable formwork solution. The Analytic Hierarchy Process (AHP) method is a decision-making tool that can be useful in selecting the best formwork solution for constructing high-rise buildings. The AHP method allows decision-makers to break down complex decisions into smaller, more manageable parts and to evaluate alternatives based on a set of criteria. The paper presents the process and propose the use of the method in selecting formwork options.
ISSN:2267-1242