Development of earthquake instrumentation for shutdown and restart criteria of the nuclear power plant using multivariable decision-making process
This article presents a new design of earthquake instrumentation that is suitable for quick decision-making after the seismic event at the nuclear power plant (NPP). The main objective of this work is to ensure more availability of the NPP by expediting walk-down period when the seismic wave is inci...
Main Authors: | Md M. Hasan, Joyce K. Mayaka, Jae C. Jung |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018-08-01
|
Series: | Nuclear Engineering and Technology |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1738573317308252 |
Similar Items
-
Simulation of oil pipeline shutdown and restart modes
by: Bekibayev, T. T., et al.
Published: (2021) -
Numerical simulation for the heat transfer behavior of oil pipeline during the shutdown and restart process
by: Lixin Wei, et al.
Published: (2018-09-01) -
Dynamic Response of AP1000 Nuclear Island Due to Safe Shutdown Earthquake Loading
by: Gan Buntara S., et al.
Published: (2017-01-01) -
Predictive Model of Restart-Up Pressure Drop after Shutdown for Heavy Oil–Water Ring Transportation Pipeline
by: Xiaoyun Yin, et al.
Published: (2024-03-01) -
Optimal shutdown control of nuclear reactors /
by: 359892 Ash, Milton
Published: (1966)