Simulation to asses a payment proposal for Black Start service in Colombia
This article presents a payment proposal for Black-Start Service (BSS), which consists of bilateral procurements between generators and the administrator of the National Interconnected System (SIN). The procurement of Black-Start’s MegaWatt (MW) depends on both the maximum demand and the stability...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidad de Antioquia
2012-12-01
|
Series: | Revista Facultad de Ingeniería Universidad de Antioquia |
Subjects: | |
Online Access: | https://revistas.udea.edu.co/index.php/ingenieria/article/view/13831 |
_version_ | 1797861601222590464 |
---|---|
author | Sandra Ximena Carvajal Quintero Santiago Arango Aramburo |
author_facet | Sandra Ximena Carvajal Quintero Santiago Arango Aramburo |
author_sort | Sandra Ximena Carvajal Quintero |
collection | DOAJ |
description |
This article presents a payment proposal for Black-Start Service (BSS), which consists of bilateral procurements between generators and the administrator of the National Interconnected System (SIN). The procurement of Black-Start’s MegaWatt (MW) depends on both the maximum demand and the stability of each operative area. This proposal is analyzed using System Dynamics (SD) in order to assess the impact on the behavior of the generators regarding the payment proposal. The simulation model has a time horizon of 20 years and includes the Contract Time (CT), the contract amount (AC), and the number of agents (NA). Model results show that the procurements duration is essential to ensure the necessary participation in each contract period.
|
first_indexed | 2024-04-09T22:05:42Z |
format | Article |
id | doaj.art-1121fed3fe7d4aa685de55a0cfa17b15 |
institution | Directory Open Access Journal |
issn | 0120-6230 2422-2844 |
language | English |
last_indexed | 2024-04-09T22:05:42Z |
publishDate | 2012-12-01 |
publisher | Universidad de Antioquia |
record_format | Article |
series | Revista Facultad de Ingeniería Universidad de Antioquia |
spelling | doaj.art-1121fed3fe7d4aa685de55a0cfa17b152023-03-23T12:36:41ZengUniversidad de AntioquiaRevista Facultad de Ingeniería Universidad de Antioquia0120-62302422-28442012-12-015910.17533/udea.redin.13831Simulation to asses a payment proposal for Black Start service in ColombiaSandra Ximena Carvajal Quintero0Santiago Arango Aramburo1National University of ColombiaNational University of Colombia This article presents a payment proposal for Black-Start Service (BSS), which consists of bilateral procurements between generators and the administrator of the National Interconnected System (SIN). The procurement of Black-Start’s MegaWatt (MW) depends on both the maximum demand and the stability of each operative area. This proposal is analyzed using System Dynamics (SD) in order to assess the impact on the behavior of the generators regarding the payment proposal. The simulation model has a time horizon of 20 years and includes the Contract Time (CT), the contract amount (AC), and the number of agents (NA). Model results show that the procurements duration is essential to ensure the necessary participation in each contract period. https://revistas.udea.edu.co/index.php/ingenieria/article/view/13831ancillary servicesblack-start power system restorationsystem dynamics |
spellingShingle | Sandra Ximena Carvajal Quintero Santiago Arango Aramburo Simulation to asses a payment proposal for Black Start service in Colombia Revista Facultad de Ingeniería Universidad de Antioquia ancillary services black-start power system restoration system dynamics |
title | Simulation to asses a payment proposal for Black Start service in Colombia |
title_full | Simulation to asses a payment proposal for Black Start service in Colombia |
title_fullStr | Simulation to asses a payment proposal for Black Start service in Colombia |
title_full_unstemmed | Simulation to asses a payment proposal for Black Start service in Colombia |
title_short | Simulation to asses a payment proposal for Black Start service in Colombia |
title_sort | simulation to asses a payment proposal for black start service in colombia |
topic | ancillary services black-start power system restoration system dynamics |
url | https://revistas.udea.edu.co/index.php/ingenieria/article/view/13831 |
work_keys_str_mv | AT sandraximenacarvajalquintero simulationtoassesapaymentproposalforblackstartserviceincolombia AT santiagoarangoaramburo simulationtoassesapaymentproposalforblackstartserviceincolombia |