Simulation to asses a payment proposal for Black Start service in Colombia
This article presents a payment proposal for Black-Start Service (BSS), which consists of bilateral procurements between generators and the administrator of the National Interconnected System (SIN). The procurement of Black-Start’s MegaWatt (MW) depends on both the maximum demand and the stability...
Main Authors: | Sandra Ximena Carvajal Quintero, Santiago Arango Aramburo |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidad de Antioquia
2012-12-01
|
Series: | Revista Facultad de Ingeniería Universidad de Antioquia |
Subjects: | |
Online Access: | https://revistas.udea.edu.co/index.php/ingenieria/article/view/13831 |
Similar Items
-
A Study of incentives to increase the use of DG in Colombia based on a System Dynamics modeling
by: S. B. Carvajal-Quintero, et al.
Published: (2011-06-01) -
VSC-HVDC and Its Applications for Black Start Restoration Processes
by: Rafael Sanchez Garciarivas, et al.
Published: (2021-06-01) -
Optimal skeleton-network restoration considering generator start-up sequence and load pickup
by: Sun, Lei, et al.
Published: (2020) -
A Novel Modeling for Assessing Frequency Behavior During a Hydro-to-Thermal Plant Black Start Restoration Test
by: Roberto Benato, et al.
Published: (2019-01-01) -
Black Start Strategy for PV-ESS Multi-Microgrids with Three-Phase/Single-Phase Architecture
by: Zhirong Xu, et al.
Published: (2016-05-01)