Optimization of Construction Process and Determination of Intermediate Cable Forces for Composite Beam Cable-Stayed Bridge
This paper presents a comprehensive study of the Xiangsizhou Bridge, a double-tower double-cable steel–concrete composite girder cable-stayed bridge located in Pingnan, Guangxi, China. A finite element model of the full-bridge spatial truss system was established using a dual main beam simulation of...
Main Authors: | Ersen Huang, Hongjun Ke, Huanhuan Hu |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-05-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/13/9/5738 |
Similar Items
-
Cable stayed bridges /
by: Walther, Rene
Published: (1999) -
Cable stayed bridges /
by: Walther, Rene
Published: (c198) -
Cable stayed bridge construction : case study of Sungai Johor cable stayed bridge /
by: Lee, Foo Wei, 1985-, et al.
Published: (2009) -
Cable stayed bridge construction [electronic resource] : case study of Sungai Johor cable stayed bridge /
by: Lee, Foo Wei, 1985-, et al.
Published: (2009) -
Condition Assessment of Grouped Cable Forces of Cable-Stayed Bridge Using Deflection Data
by: Xiaoling Liu, et al.
Published: (2023-02-01)