Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A

A reservoir in Block A of an oil field is a new layer series in the new area, and a horizontal well has been deployed for the first time around the development of the target layer in the third section of the reservoir. Compared with the oil layers in the old area, the structure of the target layer i...

Full description

Bibliographic Details
Main Authors: Wang Peng, Zhang Hui, Li Jun, Zhou Yuting, Fan Yifeng
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Subjects:
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/53/e3sconf_ogegs2023_01016.pdf
_version_ 1828716226181857280
author Wang Peng
Zhang Hui
Li Jun
Zhou Yuting
Fan Yifeng
author_facet Wang Peng
Zhang Hui
Li Jun
Zhou Yuting
Fan Yifeng
author_sort Wang Peng
collection DOAJ
description A reservoir in Block A of an oil field is a new layer series in the new area, and a horizontal well has been deployed for the first time around the development of the target layer in the third section of the reservoir. Compared with the oil layers in the old area, the structure of the target layer in Block A is more complex, the reservoir changes rapidly, the prediction of sand-laden mud reservoir is difficult, and the tracking adjustment of horizontal wells while drilling is difficult. In view of the above problems, in order to ensure the drilling effect, we have carried out the basic geological research of the combination of well and earthquake, carried out the study of the correlation between rock and electricity and the combination of well and earthquake, carried out the multi-technology combination, innovatively formed the supporting technical methods of fine fault, micro-amplitude structure identification and reservoir prediction, established the fine three-dimensional geological model, optimized the well location and trajectory optimization design of favorable blocks, According to the technical process of “making plans before drilling, timely adjustment during drilling, and re-recognition after drilling”, 7 horizontal wells have been tracked and adjusted while drilling, with an average oil reservoir drilling rate of 85.3%, which has achieved good drilling results and increased geological reserves and productivity.
first_indexed 2024-03-12T14:09:21Z
format Article
id doaj.art-12bee826c6a54d12ae0ce924d638f236
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-12T14:09:21Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-12bee826c6a54d12ae0ce924d638f2362023-08-21T09:02:44ZengEDP SciencesE3S Web of Conferences2267-12422023-01-014160101610.1051/e3sconf/202341601016e3sconf_ogegs2023_01016Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block AWang Peng0Zhang Hui1Li Jun2Zhou Yuting3Fan Yifeng4China University of Petroleum-BeijingChina University of Petroleum-BeijingChina University of Petroleum-BeijingChina University of Petroleum-BeijingCNPC Engineering Technology R&D Company LimitedA reservoir in Block A of an oil field is a new layer series in the new area, and a horizontal well has been deployed for the first time around the development of the target layer in the third section of the reservoir. Compared with the oil layers in the old area, the structure of the target layer in Block A is more complex, the reservoir changes rapidly, the prediction of sand-laden mud reservoir is difficult, and the tracking adjustment of horizontal wells while drilling is difficult. In view of the above problems, in order to ensure the drilling effect, we have carried out the basic geological research of the combination of well and earthquake, carried out the study of the correlation between rock and electricity and the combination of well and earthquake, carried out the multi-technology combination, innovatively formed the supporting technical methods of fine fault, micro-amplitude structure identification and reservoir prediction, established the fine three-dimensional geological model, optimized the well location and trajectory optimization design of favorable blocks, According to the technical process of “making plans before drilling, timely adjustment during drilling, and re-recognition after drilling”, 7 horizontal wells have been tracked and adjusted while drilling, with an average oil reservoir drilling rate of 85.3%, which has achieved good drilling results and increased geological reserves and productivity.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/53/e3sconf_ogegs2023_01016.pdfhorizontal wellfine seismic interpretationgeological modellingtrack optimizationtracking while drilling
spellingShingle Wang Peng
Zhang Hui
Li Jun
Zhou Yuting
Fan Yifeng
Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
E3S Web of Conferences
horizontal well
fine seismic interpretation
geological modelling
track optimization
tracking while drilling
title Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
title_full Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
title_fullStr Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
title_full_unstemmed Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
title_short Field Research and Application of Tracking Adjustment Technology While Drilling for a Horizontal Well in Block A
title_sort field research and application of tracking adjustment technology while drilling for a horizontal well in block a
topic horizontal well
fine seismic interpretation
geological modelling
track optimization
tracking while drilling
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/53/e3sconf_ogegs2023_01016.pdf
work_keys_str_mv AT wangpeng fieldresearchandapplicationoftrackingadjustmenttechnologywhiledrillingforahorizontalwellinblocka
AT zhanghui fieldresearchandapplicationoftrackingadjustmenttechnologywhiledrillingforahorizontalwellinblocka
AT lijun fieldresearchandapplicationoftrackingadjustmenttechnologywhiledrillingforahorizontalwellinblocka
AT zhouyuting fieldresearchandapplicationoftrackingadjustmenttechnologywhiledrillingforahorizontalwellinblocka
AT fanyifeng fieldresearchandapplicationoftrackingadjustmenttechnologywhiledrillingforahorizontalwellinblocka