Back-analysing rock mass modulus from monitoring data of two tunnels in Sydney, Australia

This paper presents two case studies where the rock mass modulus and in situ stress are estimated from the monitoring data obtained during the construction of underground excavations in Sydney, Australia. The case studies comprise the widening of existing twin road tunnels within Hawkesbury sandston...

Full description

Bibliographic Details
Main Author: Robert Bertuzzi
Format: Article
Language:English
Published: Elsevier 2017-10-01
Series:Journal of Rock Mechanics and Geotechnical Engineering
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1674775516302104
Description
Summary:This paper presents two case studies where the rock mass modulus and in situ stress are estimated from the monitoring data obtained during the construction of underground excavations in Sydney, Australia. The case studies comprise the widening of existing twin road tunnels within Hawkesbury sandstone and the excavation of a large cavern within Ashfield shale. While back-analysis from detailed systematic monitoring has been previously published, this paper presents a relatively simple methodology to derive rock mass modulus and in situ stress from the relatively simple displacement data routinely recorded during tunnelling.
ISSN:1674-7755