SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit

Objectives: The infection prevention team (IPT) was tasked with providing technical guidance for the construction and setup of a community treatment facility in 3 weeks at a Formula 1 (F1) racing pit to house elderly SARS-CoV-2–positive cases. Methods: The facility was setup with 737 beds including...

Full description

Bibliographic Details
Main Authors: Wee Ling Tee, Somani Jyoti, Razali Bin Mahdi, Cathrine Teo
Format: Article
Language:English
Published: Cambridge University Press 2023-02-01
Series:Antimicrobial Stewardship & Healthcare Epidemiology
Online Access:https://www.cambridge.org/core/product/identifier/S2732494X23000281/type/journal_article
_version_ 1797869453881376768
author Wee Ling Tee
Somani Jyoti
Razali Bin Mahdi
Cathrine Teo
author_facet Wee Ling Tee
Somani Jyoti
Razali Bin Mahdi
Cathrine Teo
author_sort Wee Ling Tee
collection DOAJ
description Objectives: The infection prevention team (IPT) was tasked with providing technical guidance for the construction and setup of a community treatment facility in 3 weeks at a Formula 1 (F1) racing pit to house elderly SARS-CoV-2–positive cases. Methods: The facility was setup with 737 beds including an isolation unit and a resuscitation bay. The multidisciplinary team decided on zone segregation (ie, green and hot zones) and discussed the clean–dirty workflow. IPC measures were revisited, especially regarding the layout of the donning and doffing station, as the facility expanded to accommodate patients with more comorbidities and those who needed dialysis. IPC training for nominated infection control liaison officers (ICLOs) was conducted using a “train the trainer” approach for mask fitting, hand hygiene, donning and doffing of personal protective equipment (PPE). Enhanced IPC measures, including weekly audit and staff surveillance, were mandatory, and monitoring was performed according to MOH guidelines. Linen and waste management and the cleaning and disinfection process were established at the beginning of the project. Results: Construction was completed within 3 weeks. The setup was completed in November 2021 for 737 beds. There were 758 admissions during the 4-month operation. In total, 12 trained ICLOs oversaw the training of 200 healthcare workers. They conducted 12 IPC audits and provided feedback to all staff. Compliance with PPE practices was inconsistent, and findings were shared during daily after-action reviews for improvement. The greatest challenges were converting the F1 facility to a healthcare facility, training staff with no IPC knowledge, and monitoring IPC on the ground. The trained ICLOs were successful in implementing, practicing, and monitoring IPC measures with minimal assistance from the infection prevention team. Conclusions: Operation began on November 5, 2021, and ceased on March 9, 2022. The community treatment facility construction, setup, and operations were completed within a short timeframe due to the efforts of various stakeholders. We faced many challenges, but we managed to implement and uphold IPC standards from beginning to end.
first_indexed 2024-04-10T00:12:52Z
format Article
id doaj.art-12cb0a5d54b745738d2377a62e95f696
institution Directory Open Access Journal
issn 2732-494X
language English
last_indexed 2024-04-10T00:12:52Z
publishDate 2023-02-01
publisher Cambridge University Press
record_format Article
series Antimicrobial Stewardship & Healthcare Epidemiology
spelling doaj.art-12cb0a5d54b745738d2377a62e95f6962023-03-16T07:24:48ZengCambridge University PressAntimicrobial Stewardship & Healthcare Epidemiology2732-494X2023-02-013s9s910.1017/ash.2023.28SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 PitWee Ling Tee0Somani Jyoti1Razali Bin Mahdi2Cathrine Teo3National University Hospital, SingaporeSingapore National University Hospital, SingaporeSingapore National University Hospital, SingaporeSingapore National University Hospital, SingaporeObjectives: The infection prevention team (IPT) was tasked with providing technical guidance for the construction and setup of a community treatment facility in 3 weeks at a Formula 1 (F1) racing pit to house elderly SARS-CoV-2–positive cases. Methods: The facility was setup with 737 beds including an isolation unit and a resuscitation bay. The multidisciplinary team decided on zone segregation (ie, green and hot zones) and discussed the clean–dirty workflow. IPC measures were revisited, especially regarding the layout of the donning and doffing station, as the facility expanded to accommodate patients with more comorbidities and those who needed dialysis. IPC training for nominated infection control liaison officers (ICLOs) was conducted using a “train the trainer” approach for mask fitting, hand hygiene, donning and doffing of personal protective equipment (PPE). Enhanced IPC measures, including weekly audit and staff surveillance, were mandatory, and monitoring was performed according to MOH guidelines. Linen and waste management and the cleaning and disinfection process were established at the beginning of the project. Results: Construction was completed within 3 weeks. The setup was completed in November 2021 for 737 beds. There were 758 admissions during the 4-month operation. In total, 12 trained ICLOs oversaw the training of 200 healthcare workers. They conducted 12 IPC audits and provided feedback to all staff. Compliance with PPE practices was inconsistent, and findings were shared during daily after-action reviews for improvement. The greatest challenges were converting the F1 facility to a healthcare facility, training staff with no IPC knowledge, and monitoring IPC on the ground. The trained ICLOs were successful in implementing, practicing, and monitoring IPC measures with minimal assistance from the infection prevention team. Conclusions: Operation began on November 5, 2021, and ceased on March 9, 2022. The community treatment facility construction, setup, and operations were completed within a short timeframe due to the efforts of various stakeholders. We faced many challenges, but we managed to implement and uphold IPC standards from beginning to end.https://www.cambridge.org/core/product/identifier/S2732494X23000281/type/journal_article
spellingShingle Wee Ling Tee
Somani Jyoti
Razali Bin Mahdi
Cathrine Teo
SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
Antimicrobial Stewardship & Healthcare Epidemiology
title SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
title_full SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
title_fullStr SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
title_full_unstemmed SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
title_short SG-APSIC1200: Infection prevention control along the fast track: Supporting the construction, operation, and closure of a COVID-19 community treatment facility in an F1 Pit
title_sort sg apsic1200 infection prevention control along the fast track supporting the construction operation and closure of a covid 19 community treatment facility in an f1 pit
url https://www.cambridge.org/core/product/identifier/S2732494X23000281/type/journal_article
work_keys_str_mv AT weelingtee sgapsic1200infectionpreventioncontrolalongthefasttracksupportingtheconstructionoperationandclosureofacovid19communitytreatmentfacilityinanf1pit
AT somanijyoti sgapsic1200infectionpreventioncontrolalongthefasttracksupportingtheconstructionoperationandclosureofacovid19communitytreatmentfacilityinanf1pit
AT razalibinmahdi sgapsic1200infectionpreventioncontrolalongthefasttracksupportingtheconstructionoperationandclosureofacovid19communitytreatmentfacilityinanf1pit
AT cathrineteo sgapsic1200infectionpreventioncontrolalongthefasttracksupportingtheconstructionoperationandclosureofacovid19communitytreatmentfacilityinanf1pit