A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
The gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximi...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2018-08-01
|
Series: | Energies |
Subjects: | |
Online Access: | http://www.mdpi.com/1996-1073/11/8/2084 |
_version_ | 1798026896256008192 |
---|---|
author | Rui Wu Qingyuan He Joung Oh Zecheng Li Chengguo Zhang |
author_facet | Rui Wu Qingyuan He Joung Oh Zecheng Li Chengguo Zhang |
author_sort | Rui Wu |
collection | DOAJ |
description | The gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximizes the recovery rate by pillarless mining but increases the difficulty in gob-side entry support. Also, this method has limited applications in hard roof conditions. The gob-side entry driving mine site uses the rib pillar to separate the gob entry and the gob area of the previous panel, which leads to additional coal losses. The waste is more intolerable in large-cutting-height panels and longwall top coal caving panels as the Chinese government limits the minimum recovery rate of longwall panels using these mining methods. In this paper, a new gob-side entry layout method, termed gob-side pre-backfill driving, is established to overcome the shortcomings of the existing methods. The new method eliminates rib pillar losses and enhances gob-side entry stability. The feasibility of gob-side pre-backfill driving is studied by numerical modelling and a field trial at Changcun Mine in China. The results indicate that gob-side pre-backfill driving is an alternative for gob-side entry development. This method is practical and also has the potential to bring significant economic benefits to the mining industry. |
first_indexed | 2024-04-11T18:42:37Z |
format | Article |
id | doaj.art-12d43b4a51464703b17e490288babd43 |
institution | Directory Open Access Journal |
issn | 1996-1073 |
language | English |
last_indexed | 2024-04-11T18:42:37Z |
publishDate | 2018-08-01 |
publisher | MDPI AG |
record_format | Article |
series | Energies |
spelling | doaj.art-12d43b4a51464703b17e490288babd432022-12-22T04:08:55ZengMDPI AGEnergies1996-10732018-08-01118208410.3390/en11082084en11082084A New Gob-Side Entry Layout Method for Two-Entry Longwall SystemsRui Wu0Qingyuan He1Joung Oh2Zecheng Li3Chengguo Zhang4School of Resources and Environmental Engineering, JiangXi University of Science and Technology, Ganzhou 341000, ChinaState Key Laboratory of Coal Resources and Safe Mining, School of Mines, China University of Ming and Technology, Xuzhou 221116, ChinaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaThe gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximizes the recovery rate by pillarless mining but increases the difficulty in gob-side entry support. Also, this method has limited applications in hard roof conditions. The gob-side entry driving mine site uses the rib pillar to separate the gob entry and the gob area of the previous panel, which leads to additional coal losses. The waste is more intolerable in large-cutting-height panels and longwall top coal caving panels as the Chinese government limits the minimum recovery rate of longwall panels using these mining methods. In this paper, a new gob-side entry layout method, termed gob-side pre-backfill driving, is established to overcome the shortcomings of the existing methods. The new method eliminates rib pillar losses and enhances gob-side entry stability. The feasibility of gob-side pre-backfill driving is studied by numerical modelling and a field trial at Changcun Mine in China. The results indicate that gob-side pre-backfill driving is an alternative for gob-side entry development. This method is practical and also has the potential to bring significant economic benefits to the mining industry.http://www.mdpi.com/1996-1073/11/8/2084gob-side entrypre-backfillentry stabilitypillarless mining |
spellingShingle | Rui Wu Qingyuan He Joung Oh Zecheng Li Chengguo Zhang A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems Energies gob-side entry pre-backfill entry stability pillarless mining |
title | A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems |
title_full | A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems |
title_fullStr | A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems |
title_full_unstemmed | A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems |
title_short | A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems |
title_sort | new gob side entry layout method for two entry longwall systems |
topic | gob-side entry pre-backfill entry stability pillarless mining |
url | http://www.mdpi.com/1996-1073/11/8/2084 |
work_keys_str_mv | AT ruiwu anewgobsideentrylayoutmethodfortwoentrylongwallsystems AT qingyuanhe anewgobsideentrylayoutmethodfortwoentrylongwallsystems AT joungoh anewgobsideentrylayoutmethodfortwoentrylongwallsystems AT zechengli anewgobsideentrylayoutmethodfortwoentrylongwallsystems AT chengguozhang anewgobsideentrylayoutmethodfortwoentrylongwallsystems AT ruiwu newgobsideentrylayoutmethodfortwoentrylongwallsystems AT qingyuanhe newgobsideentrylayoutmethodfortwoentrylongwallsystems AT joungoh newgobsideentrylayoutmethodfortwoentrylongwallsystems AT zechengli newgobsideentrylayoutmethodfortwoentrylongwallsystems AT chengguozhang newgobsideentrylayoutmethodfortwoentrylongwallsystems |