A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems

The gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximi...

Full description

Bibliographic Details
Main Authors: Rui Wu, Qingyuan He, Joung Oh, Zecheng Li, Chengguo Zhang
Format: Article
Language:English
Published: MDPI AG 2018-08-01
Series:Energies
Subjects:
Online Access:http://www.mdpi.com/1996-1073/11/8/2084
_version_ 1798026896256008192
author Rui Wu
Qingyuan He
Joung Oh
Zecheng Li
Chengguo Zhang
author_facet Rui Wu
Qingyuan He
Joung Oh
Zecheng Li
Chengguo Zhang
author_sort Rui Wu
collection DOAJ
description The gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximizes the recovery rate by pillarless mining but increases the difficulty in gob-side entry support. Also, this method has limited applications in hard roof conditions. The gob-side entry driving mine site uses the rib pillar to separate the gob entry and the gob area of the previous panel, which leads to additional coal losses. The waste is more intolerable in large-cutting-height panels and longwall top coal caving panels as the Chinese government limits the minimum recovery rate of longwall panels using these mining methods. In this paper, a new gob-side entry layout method, termed gob-side pre-backfill driving, is established to overcome the shortcomings of the existing methods. The new method eliminates rib pillar losses and enhances gob-side entry stability. The feasibility of gob-side pre-backfill driving is studied by numerical modelling and a field trial at Changcun Mine in China. The results indicate that gob-side pre-backfill driving is an alternative for gob-side entry development. This method is practical and also has the potential to bring significant economic benefits to the mining industry.
first_indexed 2024-04-11T18:42:37Z
format Article
id doaj.art-12d43b4a51464703b17e490288babd43
institution Directory Open Access Journal
issn 1996-1073
language English
last_indexed 2024-04-11T18:42:37Z
publishDate 2018-08-01
publisher MDPI AG
record_format Article
series Energies
spelling doaj.art-12d43b4a51464703b17e490288babd432022-12-22T04:08:55ZengMDPI AGEnergies1996-10732018-08-01118208410.3390/en11082084en11082084A New Gob-Side Entry Layout Method for Two-Entry Longwall SystemsRui Wu0Qingyuan He1Joung Oh2Zecheng Li3Chengguo Zhang4School of Resources and Environmental Engineering, JiangXi University of Science and Technology, Ganzhou 341000, ChinaState Key Laboratory of Coal Resources and Safe Mining, School of Mines, China University of Ming and Technology, Xuzhou 221116, ChinaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaSchool of Mining Engineering, Faculty of Engineering, University of New South Wales, Sydney 2052, AustraliaThe gob-side entry layout is popular at two-entry longwall mine sites in China for the benefit of improving the coal recovery rate. Currently, two methods have been widely used to develop gob-side entries, including gob-side entry retaining and gob-side entry driving. Gob-side entry retaining maximizes the recovery rate by pillarless mining but increases the difficulty in gob-side entry support. Also, this method has limited applications in hard roof conditions. The gob-side entry driving mine site uses the rib pillar to separate the gob entry and the gob area of the previous panel, which leads to additional coal losses. The waste is more intolerable in large-cutting-height panels and longwall top coal caving panels as the Chinese government limits the minimum recovery rate of longwall panels using these mining methods. In this paper, a new gob-side entry layout method, termed gob-side pre-backfill driving, is established to overcome the shortcomings of the existing methods. The new method eliminates rib pillar losses and enhances gob-side entry stability. The feasibility of gob-side pre-backfill driving is studied by numerical modelling and a field trial at Changcun Mine in China. The results indicate that gob-side pre-backfill driving is an alternative for gob-side entry development. This method is practical and also has the potential to bring significant economic benefits to the mining industry.http://www.mdpi.com/1996-1073/11/8/2084gob-side entrypre-backfillentry stabilitypillarless mining
spellingShingle Rui Wu
Qingyuan He
Joung Oh
Zecheng Li
Chengguo Zhang
A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
Energies
gob-side entry
pre-backfill
entry stability
pillarless mining
title A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
title_full A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
title_fullStr A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
title_full_unstemmed A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
title_short A New Gob-Side Entry Layout Method for Two-Entry Longwall Systems
title_sort new gob side entry layout method for two entry longwall systems
topic gob-side entry
pre-backfill
entry stability
pillarless mining
url http://www.mdpi.com/1996-1073/11/8/2084
work_keys_str_mv AT ruiwu anewgobsideentrylayoutmethodfortwoentrylongwallsystems
AT qingyuanhe anewgobsideentrylayoutmethodfortwoentrylongwallsystems
AT joungoh anewgobsideentrylayoutmethodfortwoentrylongwallsystems
AT zechengli anewgobsideentrylayoutmethodfortwoentrylongwallsystems
AT chengguozhang anewgobsideentrylayoutmethodfortwoentrylongwallsystems
AT ruiwu newgobsideentrylayoutmethodfortwoentrylongwallsystems
AT qingyuanhe newgobsideentrylayoutmethodfortwoentrylongwallsystems
AT joungoh newgobsideentrylayoutmethodfortwoentrylongwallsystems
AT zechengli newgobsideentrylayoutmethodfortwoentrylongwallsystems
AT chengguozhang newgobsideentrylayoutmethodfortwoentrylongwallsystems