Forecasting of the processing time as the base of simulation of the production system behavior in real conditions
The absence of precise information on the magnitudes that determine the behavior of the production system generates the disturbances of the system. The consequence is the low efficacy of the system and the high costs. Therefore, it is necessary to create the base for the prediction of individual mag...
Main Author: | |
---|---|
Format: | Article |
Language: | srp |
Published: |
Faculty of Forestry, Belgrade
2005-01-01
|
Series: | Glasnik Šumarskog Fakulteta: Univerzitet u Beogradu |
Subjects: | |
Online Access: | http://www.doiserbia.nb.rs/img/doi/0353-4537/2005/0353-45370592007V.pdf |
_version_ | 1818583502827814912 |
---|---|
author | Vukićević Milan |
author_facet | Vukićević Milan |
author_sort | Vukićević Milan |
collection | DOAJ |
description | The absence of precise information on the magnitudes that determine the behavior of the production system generates the disturbances of the system. The consequence is the low efficacy of the system and the high costs. Therefore, it is necessary to create the base for the prediction of individual magnitudes and thus enable the simulation of the production system behavior in real conditions. The information on time norms has a special significance. It is the base of planning the terms and of defining a part of direct costs. Modern approach in the identification of standard times should be established on new foundations. It should appreciate the specificities of the present moment, as well as the future tendencies in wood processing. They are the production system dynamistic, conditioned predominantly by discontinuous production, as well as by the necessity of cooperation of the production systems. In this study, the approach to the identification of standard times is original, supporting the modern tendencies in wood processing and it has an applicative character. |
first_indexed | 2024-12-16T08:06:18Z |
format | Article |
id | doaj.art-1338e214113e471ca3aaea86f4c945e4 |
institution | Directory Open Access Journal |
issn | 0353-4537 |
language | srp |
last_indexed | 2024-12-16T08:06:18Z |
publishDate | 2005-01-01 |
publisher | Faculty of Forestry, Belgrade |
record_format | Article |
series | Glasnik Šumarskog Fakulteta: Univerzitet u Beogradu |
spelling | doaj.art-1338e214113e471ca3aaea86f4c945e42022-12-21T22:38:27ZsrpFaculty of Forestry, BelgradeGlasnik Šumarskog Fakulteta: Univerzitet u Beogradu0353-45372005-01-0120059271310.2298/GSF0592007VForecasting of the processing time as the base of simulation of the production system behavior in real conditionsVukićević MilanThe absence of precise information on the magnitudes that determine the behavior of the production system generates the disturbances of the system. The consequence is the low efficacy of the system and the high costs. Therefore, it is necessary to create the base for the prediction of individual magnitudes and thus enable the simulation of the production system behavior in real conditions. The information on time norms has a special significance. It is the base of planning the terms and of defining a part of direct costs. Modern approach in the identification of standard times should be established on new foundations. It should appreciate the specificities of the present moment, as well as the future tendencies in wood processing. They are the production system dynamistic, conditioned predominantly by discontinuous production, as well as by the necessity of cooperation of the production systems. In this study, the approach to the identification of standard times is original, supporting the modern tendencies in wood processing and it has an applicative character.http://www.doiserbia.nb.rs/img/doi/0353-4537/2005/0353-45370592007V.pdfprocessing timestandard timesforecastingsimulation |
spellingShingle | Vukićević Milan Forecasting of the processing time as the base of simulation of the production system behavior in real conditions Glasnik Šumarskog Fakulteta: Univerzitet u Beogradu processing time standard times forecasting simulation |
title | Forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
title_full | Forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
title_fullStr | Forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
title_full_unstemmed | Forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
title_short | Forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
title_sort | forecasting of the processing time as the base of simulation of the production system behavior in real conditions |
topic | processing time standard times forecasting simulation |
url | http://www.doiserbia.nb.rs/img/doi/0353-4537/2005/0353-45370592007V.pdf |
work_keys_str_mv | AT vukicevicmilan forecastingoftheprocessingtimeasthebaseofsimulationoftheproductionsystembehaviorinrealconditions |