Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice

Recent studies have shown that stratigraphically disturbed meteoric ice bedded at Vostok Station between 3318 and 3539 m dates back to 1.2 Ma BP and possibly beyond. As part of the VOICE (Vostok Oldest Ice Challenge) initiative, a new deviation from parent hole 5G-1 was made at depths of 3270–3291 m...

Full description

Bibliographic Details
Main Authors: Aleksei V. Turkeev, Nikolai I. Vasilev, Vladimir Ya. Lipenkov, Alexey V. Bolshunov, Alexey A. Ekaykin, Andrei N. Dmitriev, Dmitrii A. Vasilev
Format: Article
Language:English
Published: Cambridge University Press 2021-09-01
Series:Annals of Glaciology
Subjects:
Online Access:https://www.cambridge.org/core/product/identifier/S0260305521000045/type/journal_article
_version_ 1811157209263898624
author Aleksei V. Turkeev
Nikolai I. Vasilev
Vladimir Ya. Lipenkov
Alexey V. Bolshunov
Alexey A. Ekaykin
Andrei N. Dmitriev
Dmitrii A. Vasilev
author_facet Aleksei V. Turkeev
Nikolai I. Vasilev
Vladimir Ya. Lipenkov
Alexey V. Bolshunov
Alexey A. Ekaykin
Andrei N. Dmitriev
Dmitrii A. Vasilev
author_sort Aleksei V. Turkeev
collection DOAJ
description Recent studies have shown that stratigraphically disturbed meteoric ice bedded at Vostok Station between 3318 and 3539 m dates back to 1.2 Ma BP and possibly beyond. As part of the VOICE (Vostok Oldest Ice Challenge) initiative, a new deviation from parent hole 5G-1 was made at depths of 3270–3291 m in the 2018/19 austral season with the aim of obtaining a replicate core of the old ice. Sidetracking was initiated using the standard KEMS-132 electromechanical drill routinely employed for deep ice coring at Vostok, without significant changes to its initial design. Here we describe the method and operating procedures for replicate coring at a targeted depth in an existing slant hole, involving the use of a cable-suspended electromechanical drill. The design of the milling cutter head used for sidetracking is presented. The performance characteristics and the experience of drilling branch-hole 5G-5 at Vostok are described and discussed.
first_indexed 2024-04-10T05:03:16Z
format Article
id doaj.art-1341df518a4645489ce1aab1eaa49dbe
institution Directory Open Access Journal
issn 0260-3055
1727-5644
language English
last_indexed 2024-04-10T05:03:16Z
publishDate 2021-09-01
publisher Cambridge University Press
record_format Article
series Annals of Glaciology
spelling doaj.art-1341df518a4645489ce1aab1eaa49dbe2023-03-09T12:27:44ZengCambridge University PressAnnals of Glaciology0260-30551727-56442021-09-016230531010.1017/aog.2021.4Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric iceAleksei V. Turkeev0https://orcid.org/0000-0002-9453-4059Nikolai I. Vasilev1Vladimir Ya. Lipenkov2Alexey V. Bolshunov3Alexey A. Ekaykin4https://orcid.org/0000-0001-9819-2802Andrei N. Dmitriev5Dmitrii A. Vasilev6https://orcid.org/0000-0001-8132-8881Arctic and Antarctic Research Institute, St. Petersburg, RussiaSaint-Petersburg Mining University, St. Petersburg, RussiaArctic and Antarctic Research Institute, St. Petersburg, RussiaSaint-Petersburg Mining University, St. Petersburg, RussiaArctic and Antarctic Research Institute, St. Petersburg, Russia Institute of Earth Sciences, St. Petersburg State University, St. Petersburg, RussiaSaint-Petersburg Mining University, St. Petersburg, RussiaSaint-Petersburg Mining University, St. Petersburg, RussiaRecent studies have shown that stratigraphically disturbed meteoric ice bedded at Vostok Station between 3318 and 3539 m dates back to 1.2 Ma BP and possibly beyond. As part of the VOICE (Vostok Oldest Ice Challenge) initiative, a new deviation from parent hole 5G-1 was made at depths of 3270–3291 m in the 2018/19 austral season with the aim of obtaining a replicate core of the old ice. Sidetracking was initiated using the standard KEMS-132 electromechanical drill routinely employed for deep ice coring at Vostok, without significant changes to its initial design. Here we describe the method and operating procedures for replicate coring at a targeted depth in an existing slant hole, involving the use of a cable-suspended electromechanical drill. The design of the milling cutter head used for sidetracking is presented. The performance characteristics and the experience of drilling branch-hole 5G-5 at Vostok are described and discussed.https://www.cambridge.org/core/product/identifier/S0260305521000045/type/journal_articleIce drillingold icepaleoclimatereplicate ice coringsidetracking
spellingShingle Aleksei V. Turkeev
Nikolai I. Vasilev
Vladimir Ya. Lipenkov
Alexey V. Bolshunov
Alexey A. Ekaykin
Andrei N. Dmitriev
Dmitrii A. Vasilev
Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
Annals of Glaciology
Ice drilling
old ice
paleoclimate
replicate ice coring
sidetracking
title Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
title_full Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
title_fullStr Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
title_full_unstemmed Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
title_short Drilling the new 5G-5 branch hole at Vostok Station for collecting a replicate core of old meteoric ice
title_sort drilling the new 5g 5 branch hole at vostok station for collecting a replicate core of old meteoric ice
topic Ice drilling
old ice
paleoclimate
replicate ice coring
sidetracking
url https://www.cambridge.org/core/product/identifier/S0260305521000045/type/journal_article
work_keys_str_mv AT alekseivturkeev drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT nikolaiivasilev drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT vladimiryalipenkov drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT alexeyvbolshunov drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT alexeyaekaykin drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT andreindmitriev drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice
AT dmitriiavasilev drillingthenew5g5branchholeatvostokstationforcollectingareplicatecoreofoldmeteoricice