Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine

Losses caused by unreliable machines in a production line will affect the total cost losses from a manufacturing company's production process. Based on historical data of damage that has been obtained from the maintenance department of XYZ companies, the MACH MWJ 9/10 Shot Blast Machine is the...

Full description

Bibliographic Details
Main Authors: Jasmine Raisya Salsabila, Fransiskus Tatas Dwi Atmaji, Aji Pamoso
Format: Article
Language:English
Published: Muhammadiyah University Press 2020-12-01
Series:Jurnal Ilmiah Teknik Industri
Subjects:
Online Access:http://journals.ums.ac.id/index.php/jiti/article/view/11961
_version_ 1818844460767772672
author Jasmine Raisya Salsabila
Fransiskus Tatas Dwi Atmaji
Aji Pamoso
author_facet Jasmine Raisya Salsabila
Fransiskus Tatas Dwi Atmaji
Aji Pamoso
author_sort Jasmine Raisya Salsabila
collection DOAJ
description Losses caused by unreliable machines in a production line will affect the total cost losses from a manufacturing company's production process. Based on historical data of damage that has been obtained from the maintenance department of XYZ companies, the MACH MWJ 9/10 Shot Blast Machine is the machine that has the highest-level frequency of damage. This machine is useful for cleaning sand or residual production dirt that sticks to workpieces that have been cast in the casting process, especially for E-Clips components. The research's purpose is to determine the value of cost losses due to machine unreliability using the Cost of Unreliability (COUR) method, with Business Consequence analysis (BC) analysis. The cost effects of these costs include Corrective COUR and Downtime COUR. The final calculation of COUR shows that the total cost of COUR Downtime caused by the unreliability of the machine is greater than the total Corrective COUR. After calculating the COUR, an analysis of the business consequences resulting from the machine's unreliability is carried out using a risk matrix. The analysis results show that the shot blast machine's critical components are in the red or high-risk category and have a very high Probability of Failure (PoF). The results of COUR analysis with business consequence analysis will be an input for the company to make a machine maintenance system policy, especially for the MACH MWJ 9/10 Shot Blast machine's critical components. In general, this research's novelty is to combine the application of the Cost of Unreliability method with an analysis of the effects of the Business Consequence caused by the machine's selected critical components.
first_indexed 2024-12-19T05:14:07Z
format Article
id doaj.art-1354d9146bd0485dbeabe6eff59d41cc
institution Directory Open Access Journal
issn 1412-6869
2460-4038
language English
last_indexed 2024-12-19T05:14:07Z
publishDate 2020-12-01
publisher Muhammadiyah University Press
record_format Article
series Jurnal Ilmiah Teknik Industri
spelling doaj.art-1354d9146bd0485dbeabe6eff59d41cc2022-12-21T20:34:43ZengMuhammadiyah University PressJurnal Ilmiah Teknik Industri1412-68692460-40382020-12-0119222323410.23917/jiti.v19i2.119615995Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast MachineJasmine Raisya Salsabila0Fransiskus Tatas Dwi Atmaji1Aji Pamoso2Telkom UniversityTelkom UniversityTelkom UniversityLosses caused by unreliable machines in a production line will affect the total cost losses from a manufacturing company's production process. Based on historical data of damage that has been obtained from the maintenance department of XYZ companies, the MACH MWJ 9/10 Shot Blast Machine is the machine that has the highest-level frequency of damage. This machine is useful for cleaning sand or residual production dirt that sticks to workpieces that have been cast in the casting process, especially for E-Clips components. The research's purpose is to determine the value of cost losses due to machine unreliability using the Cost of Unreliability (COUR) method, with Business Consequence analysis (BC) analysis. The cost effects of these costs include Corrective COUR and Downtime COUR. The final calculation of COUR shows that the total cost of COUR Downtime caused by the unreliability of the machine is greater than the total Corrective COUR. After calculating the COUR, an analysis of the business consequences resulting from the machine's unreliability is carried out using a risk matrix. The analysis results show that the shot blast machine's critical components are in the red or high-risk category and have a very high Probability of Failure (PoF). The results of COUR analysis with business consequence analysis will be an input for the company to make a machine maintenance system policy, especially for the MACH MWJ 9/10 Shot Blast machine's critical components. In general, this research's novelty is to combine the application of the Cost of Unreliability method with an analysis of the effects of the Business Consequence caused by the machine's selected critical components.http://journals.ums.ac.id/index.php/jiti/article/view/11961cost of unreliability, maintenance, corrective, downtime, business consequence.
spellingShingle Jasmine Raisya Salsabila
Fransiskus Tatas Dwi Atmaji
Aji Pamoso
Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
Jurnal Ilmiah Teknik Industri
cost of unreliability, maintenance, corrective, downtime, business consequence.
title Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
title_full Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
title_fullStr Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
title_full_unstemmed Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
title_short Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
title_sort maintenance cost analysis using cost of unreliability cour method with business consequence analysis a case study of shot blast machine
topic cost of unreliability, maintenance, corrective, downtime, business consequence.
url http://journals.ums.ac.id/index.php/jiti/article/view/11961
work_keys_str_mv AT jasmineraisyasalsabila maintenancecostanalysisusingcostofunreliabilitycourmethodwithbusinessconsequenceanalysisacasestudyofshotblastmachine
AT fransiskustatasdwiatmaji maintenancecostanalysisusingcostofunreliabilitycourmethodwithbusinessconsequenceanalysisacasestudyofshotblastmachine
AT ajipamoso maintenancecostanalysisusingcostofunreliabilitycourmethodwithbusinessconsequenceanalysisacasestudyofshotblastmachine