Maintenance Cost Analysis Using Cost of Unreliability (COUR) Method with Business Consequence Analysis : A Case Study of Shot Blast Machine
Losses caused by unreliable machines in a production line will affect the total cost losses from a manufacturing company's production process. Based on historical data of damage that has been obtained from the maintenance department of XYZ companies, the MACH MWJ 9/10 Shot Blast Machine is the...
Main Authors: | Jasmine Raisya Salsabila, Fransiskus Tatas Dwi Atmaji, Aji Pamoso |
---|---|
Format: | Article |
Language: | English |
Published: |
Muhammadiyah University Press
2020-12-01
|
Series: | Jurnal Ilmiah Teknik Industri |
Subjects: | |
Online Access: | http://journals.ums.ac.id/index.php/jiti/article/view/11961 |
Similar Items
-
Perencanaan Strategi Preventive Maintenance Pada Mesin Shot Blasting di PT. ABC dengan Klasifikasi ISMO
by: Herman Budi Harja, et al.
Published: (2021-04-01) -
Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines
by: Paolo Renna
Published: (2018-12-01) -
Narrative Unreliability in Paula Hawkins’ The Girl on the Train as a Strategy of Reader Immersion
by: Tetiana Grebeniuk
Published: (2018-11-01) -
Cost-Benefit Analysis of a Standby Retrial System with an Unreliable Server and Switching Failure
by: Tzu-Hsin Liu, et al.
Published: (2022-03-01) -
Implications of Narrative Unreliability in Kazuo Ishiguro’s The Remains of the Day
by: Elif TOPRAK SAKIZ
Published: (2019-07-01)