An Optimized Open Pit Mine Application for Limestone Quarry Production Scheduling to Maximize Net Present Value
This study involves a working limestone mine that supplies limestone to the cement factory. The two main goals of this paper are to (a) determine how long an operating mine can continue to provide the cement plant with the quality and quantity of materials it needs, and (b) explore the viability of...
Main Authors: | Devendra Joshi, Premkumar Chithaluru, Aman Singh, Arvind Yadav, Dalia H. Elkamchouchi, Jose Breñosa, Divya Anand |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-11-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/10/21/4140 |
Similar Items
-
A Novel Large-Scale Stochastic Pushback Design Merged with a Minimum Cut Algorithm for Open Pit Mine Production Scheduling
by: Devendra Joshi, et al.
Published: (2022-09-01) -
Assessment of blastability index in massive limestone from Rawang Quarry, Selangor /
by: Haizam Hamidun, 1994- author 648285, et al.
Published: (2023) -
Assessment of blastability index in massive limestone from Rawang Quarry, Selangor /
by: Haizam Hamidun, 1994- author 648285
Published: (2023) -
Limestone quarries in the Kinta district - a look at the exploitation of rock resources/
by: 339448 Aw, P. C., et al.
Published: (1978) -
Investigating the limestone quarries as geoheritage sites: Case of Mardin ancient quarry
by: Karataş Lale, et al.
Published: (2023-04-01)