Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants
In the context of Environmental Licensing (EL), project screening is an essential process that establishes whether Environmental Impact Assessment is needed or not. This paper analyzes the EL screening of a type of Small Hydroelectric Power Plants (less than 3 MW) in Espírito Santo state and compar...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universidade de Brasília
2022-04-01
|
Series: | Sustentabilidade em Debate |
Subjects: | |
Online Access: | https://periodicos.unb.br/index.php/sust/article/view/40633 |
_version_ | 1818539207954530304 |
---|---|
author | Fernanda Aparecida Veronez Maria Stella Sena Estevam Maria Rita Raimundo e Almeida |
author_facet | Fernanda Aparecida Veronez Maria Stella Sena Estevam Maria Rita Raimundo e Almeida |
author_sort | Fernanda Aparecida Veronez |
collection | DOAJ |
description |
In the context of Environmental Licensing (EL), project screening is an essential process that establishes whether Environmental Impact Assessment is needed or not. This paper analyzes the EL screening of a type of Small Hydroelectric Power Plants (less than 3 MW) in Espírito Santo state and compares it with other states in Brazil. The methodological process involved document analysis, good practices criteria application, and comparative analyses of the case study. The document analysis allowed us to understand how EL procedures in Espírito Santo have changed over time. The good practices criteria application allowed us to discuss how well processes aligned with outlined objectives. Finally, the comparative analysis between Espírito Santo and other Brazilian states allowed us to identify possible improvements for Espírito Santo's EL system. For example, screening could be improved by considering environmental sensitivity metrics for project classification and establishing guidelines for case-by-case analyses.
|
first_indexed | 2024-12-11T21:39:00Z |
format | Article |
id | doaj.art-15ae26d8ca144302af1c78f9cd06b29f |
institution | Directory Open Access Journal |
issn | 2177-7675 2179-9067 |
language | English |
last_indexed | 2024-12-11T21:39:00Z |
publishDate | 2022-04-01 |
publisher | Universidade de Brasília |
record_format | Article |
series | Sustentabilidade em Debate |
spelling | doaj.art-15ae26d8ca144302af1c78f9cd06b29f2022-12-22T00:49:54ZengUniversidade de BrasíliaSustentabilidade em Debate2177-76752179-90672022-04-0113110.18472/SustDeb.v13n1.2022.40633Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power PlantsFernanda Aparecida Veronez0Maria Stella Sena Estevam 1Maria Rita Raimundo e Almeida2PhD in Environmental Engineering Sciences, Full Professor, Federal Institute of Espírito Santo, Vitória, ES, BrazilUndergraduate Student in Sanitary and Environmental Engineering, Researcher, Federal Institute of Espírito Santo, Vitória, ES, BrazilPhD in Environmental Engineering Sciences, Associate Professor, Federal University of Itajubá, Itajubá, MG, Brazil In the context of Environmental Licensing (EL), project screening is an essential process that establishes whether Environmental Impact Assessment is needed or not. This paper analyzes the EL screening of a type of Small Hydroelectric Power Plants (less than 3 MW) in Espírito Santo state and compares it with other states in Brazil. The methodological process involved document analysis, good practices criteria application, and comparative analyses of the case study. The document analysis allowed us to understand how EL procedures in Espírito Santo have changed over time. The good practices criteria application allowed us to discuss how well processes aligned with outlined objectives. Finally, the comparative analysis between Espírito Santo and other Brazilian states allowed us to identify possible improvements for Espírito Santo's EL system. For example, screening could be improved by considering environmental sensitivity metrics for project classification and establishing guidelines for case-by-case analyses. https://periodicos.unb.br/index.php/sust/article/view/40633Environmental LicensingEIAScreeningHydroelectric |
spellingShingle | Fernanda Aparecida Veronez Maria Stella Sena Estevam Maria Rita Raimundo e Almeida Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants Sustentabilidade em Debate Environmental Licensing EIA Screening Hydroelectric |
title | Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants |
title_full | Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants |
title_fullStr | Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants |
title_full_unstemmed | Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants |
title_short | Environmental licensing screening in Espírito Santo state: the practice for small Hydroelectric Power Plants |
title_sort | environmental licensing screening in espirito santo state the practice for small hydroelectric power plants |
topic | Environmental Licensing EIA Screening Hydroelectric |
url | https://periodicos.unb.br/index.php/sust/article/view/40633 |
work_keys_str_mv | AT fernandaaparecidaveronez environmentallicensingscreeninginespiritosantostatethepracticeforsmallhydroelectricpowerplants AT mariastellasenaestevam environmentallicensingscreeninginespiritosantostatethepracticeforsmallhydroelectricpowerplants AT mariaritaraimundoealmeida environmentallicensingscreeninginespiritosantostatethepracticeforsmallhydroelectricpowerplants |