Contractor Selection Using Fuzzy Hybrid AHP-VIKOR
In recent years, contractors play a major role in construction projects of buildings, roads, or waterworks under supervision of project owners or employers of these projects. So, that is why contractor selection is an important decision for employers. Contractor selection is a multicriterion decisio...
Main Authors: | S. Zamani, H. Farughi, M. Soolaki |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education,
2013-12-01
|
Series: | International Journal of Research in Industrial Engineering |
Subjects: | |
Online Access: | http://www.riejournal.com/article_47967_a32c451faffefd9cea57694815268df6.pdf |
Similar Items
-
Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking
by: Mohamad Rahim Ramezaniyan, et al.
Published: (2012-08-01) -
Project management using the developed AHP–VIKOR method with the fuzzy approach
by: Ivan Milojkovic, et al.
Published: (2024-07-01) -
A HIERARCHICAL STRUCTURE FOR SHIP DIESEL ENGINE TROUBLE-SHOOTING PROBLEM USING FUZZY AHP AND FUZZY VIKOR HYBRID METHODS
by: Abit Balin, et al.
Published: (2015-03-01) -
A Hybrid Method Based on Fuzzy AHP and VIKOR for the Discrete Time-Cost-Quality Trade-off Problem
by: alireza eydi, et al.
Published: (2016-11-01) -
Developing a Multi-Criteria Decision-Making model for nuclear power plant location selection using Fuzzy Analytic Hierarchy Process and Fuzzy VIKOR methods focused on socio-economic factors
by: Rida SN. Mahmudah, et al.
Published: (2024-04-01)