Methodology for scheduling long‐term replacement of aging power transformers, considering risk
Abstract This article presents an optimization methodology to schedule the replacement of power transformers (PT) into a fleet. The objective is the minimization of the summation of the risk indices of the PT. Each PT risk index is calculated from the estimation of the life used and the strategic im...
Main Authors: | Andrés Felipe Cerón Piamba, Andrés Arturo Romero Quete, Guillermo Aponte Mayor |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2023-08-01
|
Series: | IET Generation, Transmission & Distribution |
Subjects: | |
Online Access: | https://doi.org/10.1049/gtd2.12893 |
Similar Items
-
The consequences and management of ambiguity for long-term investors
by: Hachigian, H
Published: (2014) -
Economic decision analysis /
by: Fabrycky, W. J. (Wolter J.), 1932-, et al.
Published: (1980) -
How to get rich & stay rich/
by: 250971 Young, Fred J., et al.
Published: (1988) -
How to get rich slowly but almost surely : adventures in applying the decision sciences/
by: 263533 Morris, William T.
Published: (1973) -
Metodología para la evaluación de la condición de cambiadores de derivaciones bajo carga según su índice de salud
by: Edgar Herney Cañar-Ramirez, et al.
Published: (2021-12-01)