Prioritization approach for circuit breakers to equip with condition monitoring devices

Circuit Breakers (CBs) play an important role in ensuring the safe operation of protection systems. Condition Monitoring (CM) devices are widely implemented to extend lifetime, and to improve the maintenance quality. The present paper proposes a cost-based prioritization approach for CBs in a networ...

Full description

Bibliographic Details
Main Authors: Ali Karimabadi, Mohammad Ebrahim Hajiabadi, Ebadollah Kamyab
Format: Article
Language:English
Published: Polish Academy of Sciences 2020-06-01
Series:Archives of Electrical Engineering
Subjects:
Online Access:https://journals.pan.pl/dlibra/publication/133034/edition/116234/content
_version_ 1818453531196129280
author Ali Karimabadi
Mohammad Ebrahim Hajiabadi
Ebadollah Kamyab
author_facet Ali Karimabadi
Mohammad Ebrahim Hajiabadi
Ebadollah Kamyab
author_sort Ali Karimabadi
collection DOAJ
description Circuit Breakers (CBs) play an important role in ensuring the safe operation of protection systems. Condition Monitoring (CM) devices are widely implemented to extend lifetime, and to improve the maintenance quality. The present paper proposes a cost-based prioritization approach for CBs in a network equipped withCMdevices. To this end, a mathematical formulation is developed for the categorization and modeling of equipment failures based on their severity. This formulation quantifies the effect of the CM devices on the outage rate of the equipment. The reliability parameters of the substations 400/132/20 KV, including the failure rate, , average repair time, r, average outage time, U, substations, in two status of without CM and with CM of the CBs are calculated. These parameters are calculated implementing a minimal cut-set method. The outage rate of equipment with and without the CM devices is used to determine the effect of the CM devices on the reliability of the network. Finally, the prioritization of substations to install theCMdevices on the CBs has been investigated in terms of the Expected Energy Not Supplied (EENS) and costs of CM. To verify the effectiveness and applicability of the method, the proposed approach is applied to the CBs in the power transmission network in the Khorasan Regional Electricity Company (KREC) in Iran.
first_indexed 2024-12-14T21:40:28Z
format Article
id doaj.art-18077f6fed9949709a16d9987e96862f
institution Directory Open Access Journal
issn 2300-2506
language English
last_indexed 2024-12-14T21:40:28Z
publishDate 2020-06-01
publisher Polish Academy of Sciences
record_format Article
series Archives of Electrical Engineering
spelling doaj.art-18077f6fed9949709a16d9987e96862f2022-12-21T22:46:28ZengPolish Academy of SciencesArchives of Electrical Engineering2300-25062020-06-0169240342210.24425/aee.2020.133034Prioritization approach for circuit breakers to equip with condition monitoring devicesAli Karimabadi0 Mohammad Ebrahim Hajiabadi1 Ebadollah Kamyab2Fanavaran Energy Toos Company, Mashhad, IranElectrical and Computer Engineering Department, Hakim Sabzevari University, Sabzevar, IranKhorasan Regional Electricity Company (KREC), Mashhad, IranCircuit Breakers (CBs) play an important role in ensuring the safe operation of protection systems. Condition Monitoring (CM) devices are widely implemented to extend lifetime, and to improve the maintenance quality. The present paper proposes a cost-based prioritization approach for CBs in a network equipped withCMdevices. To this end, a mathematical formulation is developed for the categorization and modeling of equipment failures based on their severity. This formulation quantifies the effect of the CM devices on the outage rate of the equipment. The reliability parameters of the substations 400/132/20 KV, including the failure rate, , average repair time, r, average outage time, U, substations, in two status of without CM and with CM of the CBs are calculated. These parameters are calculated implementing a minimal cut-set method. The outage rate of equipment with and without the CM devices is used to determine the effect of the CM devices on the reliability of the network. Finally, the prioritization of substations to install theCMdevices on the CBs has been investigated in terms of the Expected Energy Not Supplied (EENS) and costs of CM. To verify the effectiveness and applicability of the method, the proposed approach is applied to the CBs in the power transmission network in the Khorasan Regional Electricity Company (KREC) in Iran.https://journals.pan.pl/dlibra/publication/133034/edition/116234/contentcircuit breakerscondition monitoringoutage ratereliabilitysmart sensor
spellingShingle Ali Karimabadi
Mohammad Ebrahim Hajiabadi
Ebadollah Kamyab
Prioritization approach for circuit breakers to equip with condition monitoring devices
Archives of Electrical Engineering
circuit breakers
condition monitoring
outage rate
reliability
smart sensor
title Prioritization approach for circuit breakers to equip with condition monitoring devices
title_full Prioritization approach for circuit breakers to equip with condition monitoring devices
title_fullStr Prioritization approach for circuit breakers to equip with condition monitoring devices
title_full_unstemmed Prioritization approach for circuit breakers to equip with condition monitoring devices
title_short Prioritization approach for circuit breakers to equip with condition monitoring devices
title_sort prioritization approach for circuit breakers to equip with condition monitoring devices
topic circuit breakers
condition monitoring
outage rate
reliability
smart sensor
url https://journals.pan.pl/dlibra/publication/133034/edition/116234/content
work_keys_str_mv AT alikarimabadi prioritizationapproachforcircuitbreakerstoequipwithconditionmonitoringdevices
AT mohammadebrahimhajiabadi prioritizationapproachforcircuitbreakerstoequipwithconditionmonitoringdevices
AT ebadollahkamyab prioritizationapproachforcircuitbreakerstoequipwithconditionmonitoringdevices