The impact of an error in selection the pushbacks in the long-term planning of the open pit production on project quality, case study: Open pit Veliki Krivelj, Bor, Serbia
Today, there is a large number of software in which various mathematical algorithms for optimization the open pits are implemented. However, the importance of experience of the mining engineers in planning is still crucial for the quality of mining projects. Proper selection of the pushbacks is one...
Main Authors: | Kržanović Daniel, Rajković Radmilo, Jovanović Milenko, Jovanović Ivana, Mikić Miomir |
---|---|
Format: | Article |
Language: | English |
Published: |
Mining and Metallurgy Institute, Bor
2023-01-01
|
Series: | Mining and Metallurgy Engineering Bor |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2023/2334-88362301001K.pdf |
Similar Items
-
Selection of the optimum pushbacks in a long-term planning process of the open pit: A condition for maximization the net present value: Case study: The open pit Veliki Krivelj, Serbia
by: Kržanović Daniel, et al.
Published: (2018-01-01) -
Pumping of clean water in removal of precipitated material at the bottom of the Open Pit South Mining District Majdanpek
by: Rajković Radmilo, et al.
Published: (2019-01-01) -
Stripping delay analysis in relation to designed long-term plan of excavation at the open pit Veliki Krivelj
by: Vaduvesković Zoran, et al.
Published: (2013-01-01) -
Stability analysis of the integrated waste dumps of the open pits Žuta Prla and Brskovo near Mojkovac
by: Rajković Radmilo, et al.
Published: (2023-01-01) -
Analysis the possibility of increasing capacity of copper ore mining at the open pit South Mining District Majdanpek at 11x106 tons annually
by: Kržanović Daniel, et al.
Published: (2015-01-01)